Team:Panama/29 July 2010
From 2010.igem.org
(Difference between revisions)
(→July 29) |
(→July 29) |
||
Line 12: | Line 12: | ||
In each well, we added 2ul of loading buffer and 5ul of the sample. Final volume 7ul. | In each well, we added 2ul of loading buffer and 5ul of the sample. Final volume 7ul. | ||
+ | |||
+ | [[Image:Cuadro29julio.jpg.jpg|250px|thumb|left|alt text]] | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
[[Image:29-7.2.JPG|200px|thumb|left|alt text]] | [[Image:29-7.2.JPG|200px|thumb|left|alt text]] | ||
{{:Team:Panama/calendar2}} | {{:Team:Panama/calendar2}} |
Revision as of 21:22, 23 October 2010
July 29
We performed the E. coli transformation again, with three BioBrick parts. In order to check the success of the extraction, we made an electrophresis in a 1% agarose gel.
Electrophoresis
70mL of TBE 1X
0,7g of agarose
In each well, we added 2ul of loading buffer and 5ul of the sample. Final volume 7ul.
|
|
|
|
|
|