BIOTEC Dresden/Notepad/1 September 2010

From 2010.igem.org

(Difference between revisions)
 
Line 19: Line 19:
A Miniprep and glycerol stocks from the overnight cultures were prepared. A control digest to varify the correct insert was carried out. Unfortunatley not enough DNA was used to confirm the insertion.  
A Miniprep and glycerol stocks from the overnight cultures were prepared. A control digest to varify the correct insert was carried out. Unfortunatley not enough DNA was used to confirm the insertion.  
-
 
+
[[Category:BIOTEC Dresden/Notepad/September|September]]
{{Biotec_Dresden/month}}
{{Biotec_Dresden/month}}
{{Biotec_Dresden/Bottom}}
{{Biotec_Dresden/Bottom}}

Latest revision as of 22:25, 27 October 2010

Ligation of following parts with 6e (RBS)

4a, 14f, 20f, 21f

The ligation mix was then transformed by electroporation and plated and kept for overnight incubation.

Fusion Protein

A Miniprep and glycerol stocks from the overnight cultures were prepared. A control digest to varify the correct insert was carried out. Unfortunatley not enough DNA was used to confirm the insertion.


July
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
August
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
September
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
October
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Share to Twitter Share to Facebook Share to Orkut Stumble It Email This More...