BIOTEC Dresden/Notepad/31 July 2010

From 2010.igem.org

(Difference between revisions)
 
(2 intermediate revisions not shown)
Line 9: Line 9:
</head>
</head>
</html>
</html>
 +
Today, we performed mini-preps and made glycerol stocks from yesterday's overnight cultures. These BioBrick parts were ordered from MIT and are:  
Today, we performed mini-preps and made glycerol stocks from yesterday's overnight cultures. These BioBrick parts were ordered from MIT and are:  
  16, 17, 18 and 19
  16, 17, 18 and 19
Line 16: Line 17:
We expect the sequences to be ready by Tuesday, 03.08.2010
We expect the sequences to be ready by Tuesday, 03.08.2010
-
 
+
[[Category:BIOTEC Dresden/Notepad/July|July]]
-
<hr>
+
-
 
+
{{Biotec_Dresden/month}}
{{Biotec_Dresden/month}}
{{Biotec_Dresden/Bottom}}
{{Biotec_Dresden/Bottom}}

Latest revision as of 21:42, 27 October 2010

Today, we performed mini-preps and made glycerol stocks from yesterday's overnight cultures. These BioBrick parts were ordered from MIT and are:

16, 17, 18 and 19

In addition, we nanodroped the purified plasmid samples to determine the DNA concentration. The following BioBrick parts were sequenced in both directions using BioBrick primers VF and VR2 (note that two single colonies from each transformations were used):

7, 12, 23, 24, 34, 35, 36, 37, 38, 16, 17, 18 and 19

We expect the sequences to be ready by Tuesday, 03.08.2010


July
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
August
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
September
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
October
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Share to Twitter Share to Facebook Share to Orkut Stumble It Email This More...