BIOTEC Dresden/Notepad/13 September 2010
From 2010.igem.org
Revision as of 19:13, 11 October 2010 by Charansam21 (Talk | contribs)
Parts Assembly
The ligation mix from 09.09.2010 was transformed by electroporation and plated and kept for overnight incubation.
Sequencing of the following parts were done.
4a, 9b, 14f, 20f, 21f
The sequencing of 20f was found to be as expected.
Fusion Protein
A Miniprep and glycerol stocks from the overnight cultures were prepared. A control digest to varify the correct insert was carried out. Unfortunatley not enough DNA was used to confirm the insertion.
July |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
August |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
September |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | |
October |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |