BIOTEC Dresden/Notepad/17 October 2010

From 2010.igem.org

Revision as of 14:30, 21 October 2010 by Charansam21 (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Parts Assembly

Minipreps of the overnight cultures were prepared and were given for sequencing to check the presence of our desired insert.

53a, 53b, 53c, 54a, 54b, 54c, 55a, 55b, 55c, 6e-4a


July
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
August
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
September
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
October
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
{{Biotec_Dresden/Bottom}