Team:Caltech/Week 13

From 2010.igem.org

Revision as of 16:02, 17 October 2010 by Yuehan (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


iGEM 2010



Home

People

Project Details

Protocols

Completed Systems

Notebook

Biosafety

Human Impact

References

Support


Caltech logo watermark.png


Monday 9/6

  • Colony PCR cultures of L95 (HSP-LacI-EYFP) cells imaged under microscope
    • Cells are vastly overgrown and unhealthy (cultures visualized after one weekend)
  • Fresh cultures of L95 cells grown in preparation for a proper microscope imaging session

Tuesday 9/7

  • Digested successful sigma32 (HtpR) BioBrick in preparation for ligation into pSB1C3 chloramphenicol backbone
    • Treat the digestion like a backbone digestion
  • Ligated the digest into pSB1C3
  • Cleaned up the lab in preparation for mandatory leave of absence

Wednesday 9/8

  • Photographed the results of transglutaminase long-term testing (6 week span)
    • Results are stunning: TGase + cells, TGase + cell lysate forms a dark grey-colored brick about 7mm diameter (culture tube was approximately 13-14mm inside diameter!)
    • Several TGase + acid and TGase + base show very dark, vivid colors unattributable to the acid/base
  • Mandatory leave of absence begins

Thursday 9/9

The lab is being used by a class.

Friday 9/10

The lab is being used by a class.

 
Error creating thumbnail: /websites/2010.igem.org/wiki/bin/ulimit4.sh: line 4: convert: command not found
Caltech footer.png


Locations of visitors to this page