BIOTEC Dresden/Notepad/13 September 2010

From 2010.igem.org

(Difference between revisions)
 
(One intermediate revision not shown)
Line 23: Line 23:
A Miniprep and glycerol stocks from the overnight cultures were prepared. A control digest to varify the correct insert was carried out. Unfortunatley not enough DNA was used to confirm the insertion.  
A Miniprep and glycerol stocks from the overnight cultures were prepared. A control digest to varify the correct insert was carried out. Unfortunatley not enough DNA was used to confirm the insertion.  
-
 
+
[[Category:BIOTEC Dresden/Notepad/September|September]]
-
<hr>
+
-
 
+
{{Biotec_Dresden/month}}
{{Biotec_Dresden/month}}
{{Biotec_Dresden/Bottom}}
{{Biotec_Dresden/Bottom}}

Latest revision as of 22:41, 27 October 2010

Parts Assembly

The ligation mix from 09.09.2010 was transformed by electroporation and plated and kept for overnight incubation.

Sequencing of the following parts were done.

4a, 9b, 14f, 20f, 21f

The sequencing of 20f was found to be as expected.

Fusion Protein

A Miniprep and glycerol stocks from the overnight cultures were prepared. A control digest to varify the correct insert was carried out. Unfortunatley not enough DNA was used to confirm the insertion.


July
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
August
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
September
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
October
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Share to Twitter Share to Facebook Share to Orkut Stumble It Email This More...