Team:USTC Software/notebook 9
From 2010.igem.org
Contents |
Zhen Wang
Aug 30 ~ Sep 5, 2010 Plan: Think about what database modification tool a senior user would like to use. Write full database that includes the whole oscillator. Read more on XML. Have fun working.
Summary: Not having much fun working, with both sides’ tasks to be done. Full database for oscillator is done 2010/9/2. I haven’t checked it in detail yet. It is very likely we are going to change the db structure yet again, good thing though. Learn from libsbml the sbml modification tool, our db modification should somehow like that. It should focus on adding and constructing new model. Discuss on UI&input with Liao, writing the new UI draft.
Sep 5 ~ Sep 12, 2010 Plan: Discuss UI&input with Soimort. Discuss ODE solver with Kun. Teaching junior students how to write DB. Have fun working.
Summary: This is a crazy week for me! Together with Liao, we make huge modifications on the structure of for at least 3 times! We change the xml structure for storing data, revise the attributes on each item, and have heated debate on our standard of bio-modeling. At first the modification process seems endless, but by the end of the week, we have come to agreement on most of the details. This gives me a lot of hope, and this week has definitely been a big leap for our DB. This time Liao finally realizes that we are actually making the next-generation standard of SBML, haha. Settling a brand-new standard of bio-modeling has actually become the core of our work. As far as I’m concerned, we have made 3 shifts on our goal, UI -> simulation -> bio-modeling standard, this is poor goal-setting, we didn’t make a clear map of what we are doing at the very beginning. I talk on DB and modeling with 2 junior students, they are all confident and eager to learn, I think they can handle it properly very soon. I just don’t have the time to talk with Soimort and Kun.
Sep 12 ~ Sep 19, 2010 Plan: Write note on UI&input, discuss UI&input with Soimort. Discuss ODE solver with Kun. Settle the final edition of DB. Writing DB of EPF-Lausanne with 2 junior students. Have fun working.
Summary: Write a detailed note on UI&Input and discuss it with Soimort. I believe it is not easy for him to understand the whole design of UI&Input and its connection with the database, I should spend more time to explain the details for him. Kun says he has finished the L2V4 update of ODE solver, he is now working on the boolean value judging module which will be used in Liao’s code. Liao’s first edition of document on DB standard is done, it’s now my turn to refine it and fix the bugs. Zhengda He has written part of the DB of EPF-Lausanne 2009 under my guidance, we can see the whole DB by next week, hopefully. Another junior student Zhaoyi Li is working on synchronized E.coli oscillator, a biological breakthrough published on Nature 2009. Last but not least, this is a busy week for scheduling trip, paying fee and talking to sponsor. Handling these things cost me lots of time, we should have a secretary for this, luckily we find one, she is Jue Wang. My boss doesn’t push me so hard on finishing his assignment, and I’m grateful for that, he must know that I don’t have much time. I do have fun working this week!
Sep 20 ~ Sep 26, 2010 Plan: Finish EPF-Lausanne database, finish E.coli oscillator database, update DB document. Discuss UI with Soimort and push him to work faster, discuss synchronized E.coli with Zhaoyi Li. Have fun working.
Summary: Today is Oct 7, and I have just start writing work summary of the last week in Sep. During last 2 weeks we celebrated Mid-Autumn Festival and had 7 day off for National Day, while others are enjoying themselves traveling, we iGEM team members didn’t take a day off. We have to seize every minute to make our software work! I guess I’m just too busy to write my work log, and right now I am trying my best to recall what exactly I did in the last week of Sep…
Here’s what I can remember.
Zhaoyi Li looked into the nature article on synchronized ecoli clock and gave a brief lecture, then he started to analyze all the reaction and species in the model, and prepare to write the DB of it. Zhengda He’s parents came to see him, so he disappeared for 3 days or so. He has finished part of EPF-Lausanne DB but not all, so Yubo Qi kicked in to investigate the proper parameters for reaction. Unfortunately, it’s almost a hopeless task, no reliable source with specified parameters can be found, so we gave up at last.
I finished another detail draft on input UI design, and Soimort is constructing our UI according to it. I tried to discuss more with Soimort and push him harder, but can’t find the right way…
My girlfriend came and we spent 3 days together. It was 3 halves of days actually, since there are tasks I cannot put aside. However, she was so thoughtful and supportive, and didn’t complain about my absence. We had our sweet moments together. Her visiting means a lot to me, and fuels me up with energy to work on.
Kun Jiang
Sep 5 ~ Sep 12, 2010 Build two tool softwares to help Zhen Wang to edit our database input files.
Sep 12 ~ Sep 30, 2010 Modify the soslib v1.6.0 source code to base on libsbml v4.0.1, Which enable soslib support sbml version2 level 4 to meet our database format requirements.
Summary: (we will see~)
Luojun Wang
Idea of starting a community has been discussed with the wet team and will be realized soon. Concerned with IPR issue, I consult the IPRs Centre of USTC for safety of iGAME. Start of wiki scripts.
Summary: Finally, I decide to give a name to the human practice project, "the C project". "C" stands for "curriculum","communication" and "community", it is also cool, huh?
Shangyu Luo
I am in Hong Kong now! Thanks to school of computer again! I obtain a chance to live and study in Hong Kong for one semester! Though there is much to do and I have to get familiar with the environment in Hong Kong, I try my best to find time for our project. I skim most of igem teams in latest three years and list some teams whose work can show the advantages and innovations of our database. Their works are about some biological reactions related to light, temperature, PH, etc. Read a paper of Nature about synchronized Ecoli clock, try to master the idea of it and list the reactions in it. It will be added into our database.
Zhengda He
Starting completing our database , writing the story for the game . Collected appropriate project for us to design it into a game . Designing Wiki was the same-time work for me . And I also pay attention in the creative idea of our Logo and uniform . The jamboree is coming , so I must concentrate on what I'm doing . And I will have it done beautifully .
9.1
Zhen Wang
Plan: Think about what database modification tool a senior user would like to use. Write full
database that includes the whole oscillator. Read more on XML. Have fun working.
Summary: Not having much fun working, with both sides’ tasks to be done. Full database for
oscillator is done 2010/9/2. I haven’t checked it in detail yet. It is very likely we are
going to change the db structure yet again, good thing though. Learn from libsbml the sbml
modification tool, our db modification should somehow like that. It should focus on adding
and constructing new model. Discuss on UI&input with Liao, writing the new UI draft.
9.5
Kun Jiang
2010 Build two tool softwares to help Zhen Wang to edit our database input files.
9.6
Zhen Wang
Plan: Discuss UI&input with Soimort. Discuss ODE solver with Kun. Teaching junior students
how to write DB. Have fun working.
Summary: This is a crazy week for me! Together with Liao, we make huge modifications on the
structure of for at least 3 times! We change the xml structure for storing data, revise the
attributes on each item, and have heated debate on our standard of bio-modeling. At first the
modification process seems endless, but by the end of the week, we have come to agreement on
most of the details. This gives me a lot of hope, and this week has definitely been a big
leap for our DB. This time Liao finally realizes that we are actually making the next-
generation standard of SBML, haha. Settling a brand-new standard of bio-modeling has actually
become the core of our work. As far as I’m concerned, we have made 3 shifts on our goal, UI
-> simulation -> bio-modeling standard, this is poor goal-setting, we didn’t make a clear
map of what we are doing at the very beginning. I talk on DB and modeling with 2 junior
students, they are all confident and eager to learn, I think they can handle it properly very
soon. I just don’t have the time to talk with Soimort and Kun.
9.12
Kun Jiang
Modify the soslib v1.6.0 source code to base on libsbml v4.0.1, Which enable soslib support
sbml version2 level 4 to meet our database format requirements.
9.13
Zhen Wang
Plan: Write note on UI&input, discuss UI&input with Soimort. Discuss ODE solver with Kun.
Settle the final edition of DB. Writing DB of EPF-Lausanne with 2 junior students. Have fun
working.
Summary: Write a detailed note on UI&Input and discuss it with Soimort. I believe it is not
easy for him to understand the whole design of UI&Input and its connection with the database,
I should spend more time to explain the details for him. Kun says he has finished the L2V4
update of ODE solver, he is now working on the boolean value judging module which will be
used in Liao’s code. Liao’s first edition of document on DB standard is done, it’s now my
turn to refine it and fix the bugs. Zhengda He has written part of the DB of EPF-Lausanne
2009 under my guidance, we can see the whole DB by next week, hopefully. Another junior
student Zhaoyi Li is working on synchronized E.coli oscillator, a biological breakthrough
published on Nature 2009. Last but not least, this is a busy week for scheduling trip, paying
fee and talking to sponsor. Handling these things cost me lots of time, we should have a
secretary for this, luckily we find one, she is Jue Wang. My boss doesn’t push me so hard on
finishing his assignment, and I’m grateful for that, he must know that I don’t have much
time. I do have fun working this week!
9.15
Luojun Wang
Idea of starting a community has been discussed with the wet team and will be realized soon. Concerned with IPR issue, I consult the IPRs Centre of USTC for safety of iGAME. Start of wiki scripts.
Summary: Finally, I decide to give a name to the human practice project, "the C project". "C" stands
for "curriculum","communication" and "community", it is also cool, huh?
9.20
Zhen Wang
Plan: Finish EPF-Lausanne database, finish E.coli oscillator database, update DB document. Discuss UI with Soimort and push him to work faster, discuss synchronized E.coli with Zhaoyi
Li. Have fun working.
Summary: Today is Oct 7, and I have just start writing work summary of the last week in Sep. During
last 2 weeks we celebrated Mid-Autumn Festival and had 7 day off for National Day, while
others are enjoying themselves traveling, we iGEM team members didn’t take a day off. We
have to seize every minute to make our software work! I guess I’m just too busy to write my work log, and right now I am trying my best to recall
what exactly I did in the last week of Sep…
Here's what I can remember.
Zhaoyi Li looked into the nature article on synchronized ecoli clock and gave a brief
lecture, then he started to analyze all the reaction and species in the model, and prepare to
write the DB of it. Zhengda He’s parents came to see him, so he disappeared for 3 days or so. He has finished
part of EPF-Lausanne DB but not all, so Yubo Qi kicked in to investigate the proper
parameters for reaction. Unfortunately, it’s almost a hopeless task, no reliable source with
specified parameters can be found, so we gave up at last.
I finished another detail draft on input UI design, and Soimort is constructing our UI
according to it. I tried to discuss more with Soimort and push him harder, but can’t find
the right way…
My girlfriend came and we spent 3 days together. It was 3 halves of days actually, since
there are tasks I cannot put aside. However, she was so thoughtful and supportive, and didn’
t complain about my absence. We had our sweet moments together. Her visiting means a lot to
me, and fuels me up with energy to work on.
9.22
Shangyu Luo
I am in Hong Kong now! Thanks to school of computer again! I obtain a chance to live and
study in Hong Kong for one semester! Though there is much to do and I have to get familiar
with the environment in Hong Kong, I try my best to find time for our project. I skim most of
igem teams in latest three years and list some teams whose work can show the advantages and
innovations of our database. Their works are about some biological reactions related to
light, temperature, PH, etc. Read a paper of Nature about synchronized Ecoli clock, try to
master the idea of it and list the reactions in it. It will be added into our database.
Zhengda He
Starting completing our database , writing the story for the game . Collected appropriate project for us to design it into a game . Designing Wiki was the same-time work for me . And
I also pay attention in the creative idea of our Logo and uniform . The jamboree is coming ,
so I must concentrate on what I'm doing . And I will have it done beautifully .
9.30
Kun Jiang
igame in github!
- To help cooperation in our teams. I decide to use a
[http://en.wikipedia.org/wiki/Version_control_software version control software] to help to
manage our source code. Because our team members come from different department and we don't
live together, especially me, I live ten kilometers far away from USTC. So a distributed
Version control System is needed. Git is the chosen one!
- We create a repository [http://github.com/jkdirac/igame igame] in [http://github.com
github], and our team member can get the source by using [http://en.wikipedia.org/wiki/Git_
(software) git] with git URL git@github.com:jkdirac/igame.git.
Jue Wang
I ask for information and make flight reservations for 13 members (except Luo)
The itinerary
- Beijing-Boston
1. AA186 WE03NOV PEKORD 0655 0625
2. AA444 WE03NOV ORDBOS 1005 1310
- Boston-Beijing
3. AA1561 TU09NOV BOSORD 1545 1730
4. AA187 TU09NOV ORDPEK 2000 2330+1