Team:Debrecen-Hungary/Team meetings sum
From 2010.igem.org
Date:October 6th 2010 TITLE
: iGEM meeting team Debrecen Fellow iGEM team, here is a summary of our last
team meeting: 1. present at the meeting :Endre,
Kata N, ShunChieh, Lior, Ophir(skype), Yakir(skype), Daniel M, Bence, Erika, Kata S,
Lilla, Balint The meeting took place from 18:30 to 21:00 2. discussed the following: Deadlines for
subprojects-working wiki Oct 11
Parts Submission Oct 20
Poster and presentation Oct 27 Judging
form and wiki freeze Oct 27 Shortage of money for supplementary materials
such as T-shirts Shortage of Pocket
Money 3 weeks left till
the 27, the following weeks should be intensive, so everyone should work hard
and not to postpone work. Problems with the
wiki script, wiki team have to make efforts to finish it until the 11th
of Oct. Suggestion - that
everyone in the team will be responsible for 1-3 wiki pages in order to stand
in the
Deadline. Visa-Hungarian
members should check the US embassy site for ESTA and make sure everyone has it 4. The following assignments
were given : Cloning Cloning(Oct 15)- Bence and Endre – have 15 basic parts,5 fused parts(Gal4-NHR8 in PSB1C3, Gal4-NHR23 in PSB1C3, Gal4-PXR in PSB1C3, TRE-CMV-PolyA in PSB1C3, TRE-CMV-PolyA in PSB1A3 EcR should be in the highest priority Sequencing(Oct
20)-bence and ophir Plasmid growth(Oct
15)-Lilla,Endre,Kata N Parts submission(Oct
20) – Bence and Peter Luciferase – have to be done
till 20 of Oct -check for Luciferase assay amount(Peter) -wiki parts-(Lior) basic parts with description
availible, everyone should check their own parts for QA and Revision. Jamboree -Presentation-we decided to make conservative
presentation and later by Prezi By next Friday cloning
team should make presentation work -Poster- after presentation is done. -getting to the airport- Erica, Kata S should
serach for the best deal available. -T-shirts- Lilla, Timi Wiki Work -Final working wiki(oct
15) – lior, Daniel, ophir, yakir. the final code should be coordinated by
Daniel -Video protocol page-
Yakir -Pictures – Liu , the
team members who need to photo identification of themselves are Daniel, Erica,
Kata, Lilla, Timi, Gabor, Mate. -Short description from
each member of the group should be given to ophir according to the writing
rules. Videos – we have 11 final videos + 5 scripts -checking scripts –
Peter -voice – Daniel M -the following members
should help yakir – Lilla(ligand treatment), Liu(Scripts), Endre(PCR) -Uploading videos to
youtube. Regards Lior Malka Date:July 16 2010 TITLE
: iGEM meeting team Debrecen presence: Lilla, Kata, Aron,
Liu, Yakir, Bence, Kata, Timi, Alexa, Dorottya, Ophir, Lior Part I: Kata's nagy resolutions: 1. Make your work
and then leave the lab free environment 2. Do not
socialize in the Lab 3. Ask question as
much as possible! one should understand the work one is doing 4.Clean the
surface after finished the work 5. Inform about
the work you are expected to do (how many wells on the gel, etc.) 6. Update your lab
log, in such a way that others could follow it when needed Part II: Pairing up: Pairs will 'cover' for each other Pairs will present theirs problems and troubleshooting on
the daily meetings Pairs will get informed personally from the decision making
to execution Pairs will take full responsibility over theirs projects
activities Lilla-Daniel Kata- Aron Liu- Yakir Bence- Kata Timi-Alexa-
Dorottya Erika- Kristof
Endre Ophir- Lior Date:July 9th 2010 TITLE
: iGEM meeting team Debrecen Fellow iGEM team, here is a summary of our last
team meeting: 1. Who was at the meeting :Endre,
Gabor, Kata N, ShunChieh, Aron, Lior, Ophir, Yakir, Daniel,
Bence, Erika, Dorty, Kata S, Alexa, Lilla The meeting took place
from___16_ to __18___ 2. We discussed the following
administrative issues: A. The money from oil sand will arrive next week B. Prof. Nagy will help covering 2 student’s
traveling fee C. Our new schedule have
been made and we will have our unofficial meeting starting from 8:30 AM and
2 official meetings, one before noon and one in the end of the day , all these will begin to apply from
next week on D. Sponsorship of HOK
and FMSA are in progress 3. The following
scientific presentations were made: A. The
advance of the wiki team, the template has been made – Daniel B. The progress of the
video team, first video about transformation – Yakir C. The results of
the three teams - Balint The following people who are underlined have acquired the
abilities, and they should coach other students who are obliged to do the
work transfection: Lilla,
Alexa, Kata S. Lior, Endre, Erika Calculation: Bence,
Endre, KataS, Lilla, Erika, Lior Lysis: KataS,
Daniel, Bence Luciferase analysis:
KataS, Daniel, Bence Miniprep: KataN, Lior, PCR: Shun-Chieh, Alexa
Restriction/Ligation: Ophir, Shun-Chieh D. information about
how to ligate our parts – Balint E. issues regarding
the ethics in the lab - Kata Nagy 4. The following assignments
were given : A. Making a
introduction video next week– Ophir B. Write the
protocols before Monday morning – everyone C. Vote for our
logo – everyone D. The video team
will need one person to help out and some scientific consultation E. The
cloning team will need help in making solutions from other team F. Everyone should
be able to perform their works which they were assigned to, e.g. the people in transfection team should know the
calculation, and the luciferase fellows
should know the lysis and make the analysis of the result. G.
Assist in sponsorship – Kata Nagy Regards Shun-Chieh
Date:June 30 2010 TITLE
: iGEM meeting team Debrecen Fellow iGEM team, here is a summary of our last team meeting
(30.6.10, 14:00): 1. The following member attended the meeting: Kata S.
Kata N, Timi B, Shun CL. Endre K, Ophir K, Lilla O and Balint LB. The meeting took place from 14:00 to 15:00. 2. We discussed the following administrative issues (AKA
agenda’s):
3. Action items: A.
Change
of working habits (end of day, notebook’s and pre- meetings) as described above
should be undertaken by all of the TDK students B.
Today’s
wetlab work will be split into two teams: I.
The
cloning team will make another electrophoresis to confirm the results of the
maxi prep done on Monday (Kata N. and Timi B.) . An inoculation will be
made from the biobrick transformation done yesterday (Ophir K., Dorka and
Lior M). II.
The
cell culturing team will do more plating, and a transfection with the plasmids
isolated from the maxi prep done at the beginning of the week (Lilla, Shun,
Endre, Kata S.) III.
A
scheduale for the next week would be revealed on Friday morning on the gmail
calendar, everyone should inspect it. IV.
Ophir Keret Date:June 25 2010 TITLE
: iGEM meeting team Debrecen Dear Team, here is a summary of our
recent igem meeting, and I attached a simplified scheme of our future work
regards Shun-Chieh Date:June 19 2010 TITLE
: iGEM meeting team Debrecen Dear Team, here is a summary of our recent igem
meeting.
i.
Lior Malka - Team meetings delegate (making sure a summary goes out,
live internet feed, coordinating meeting time and place).
ii.
Lior Malka and Balint- New bricks design delegate (spreading the exact gene names
to be designed to each team member in goal of ordering the bricks).
iii.
Ophir Keret- Wet lab delegate (coordinate machine uses, timetable,
results backup and literature storage).
iv.
Yakir Guri – Publicity and fundraising delegate (weekly updates on
these issues, correspondence and coordination with possible fund/publicity
sources).
v.
Lilla Ozgyin – Team moral delegate (organizing team dinners and other
social activities, logo design, jamboree shirt/flag design)
vi.
Daniel Markovitz -Jamboree Trip delegate (organizing trip to Boston).
vii.
No one
has volunteered for these delegates- Wiki delegate, video tutorial delegate.
viii.
Note: Being a delegate does not mean undertaking the entire workload
but being responsible the work is done by using the human resources available Ophir Keret Date:May 7th 2010 TITLE : iGEM meeting team Debrecen Fellow iGEM team, here is a summary of our last Friday’s
meeting: 1.
The
following people were present in the meeting: no list available. The meeting started at 15:00 and ended at 16:30. 2.
We
discussed the following administrative issues: a.
A
tour of the lab at which the summer work will take place b.
Setting
team goals: bringing back at least one prize from the Jamboree. c.
Acquiring
project funds. We will need substantial funds the range is aprox 15k USD, for
this we will noeed local, hungarian and international sponsors. d.
Get
a local magazine publication. e.
Coming
spring workshop at France, June 12-13 f.
Uploading
the videos from the 2009 spring workshop g.
Generating
an idea from a competition aspect. h.
Urgency
of creating a team wiki i.
Making
a format for documenting team meetings j.
Initiating
an instructor team written agreement k.
Starting
a weekly club were two previous iGEM teams would be presented by volunteers. 3.
The
following scientific issues were presented: a.
Yakir
presented UC Davis 2009 iGEM team and concept about Celiac Disease. b.
Balint
presented certain videos about induced stem cell pluripotency. These
videos were collected for the DNA day and they are available at: http://dnsnap.blog.hu/ 4.
The
following assignments were given: a.
The
instructors – tool box concept for the competition. Balint, Gabor and Erika will present 3 short presentations of 10
minutes about the available reagents, systems and tools in their laboratories. b.
Ophir- accepted to get used to the wiki system,
share the instructional videos (https://2009.igem.org/Instructional_Videos
) of 2009and prepare for the next week with his favourite price winer team
which is Heidelberg. We would ask everyone to prepare for the next week by
finding out what the Heidelberg team made. See more info here: Wiki: https://2009.igem.org/Team:Heidelberg
i.
Poster:
https://2009.igem.org/files/poster/Heidelberg.pdf
ii.
Poster
presentation: https://2009.igem.org/files/presentation/Heidelberg.pdf
iii.
Talk:
https://2009.igem.org/files/video/Heidelberg.mp4
c.
Bence-
will preape too with his favourite team project and makes next week
presentation. d.
Yakir
will find out about how to get some publicity in the Medicus Lap- magazine.
Here is what he found out: “Hello We will make
some group images, all together; separate images (of each one of us) are
advisable - for this, you could send to me an image, which will be reasonably
sized to fit a rather small space on wiki sidebar or a magazine edge. ---------------- Dear iGEM members, As was discussed in the last meeting, we are going to
prepare an article for the newspaper ('Medicus Lap'), and to progress with the
Wiki webpage. For this, it is essential to take an image of all the group
together and some images separately, (if one has own image he/she would like to
submit it is possible). e.
Lior
– publishing a summary.- here it is! f.
Balint
– Writing a web based questionnaire regarding each individual willingness and
work boundaries, writing a meeting summary document format. A third
questionnaire about who wants to attend the spring workshop. I merged all the
question in the following questionaire: http://t7.hu/c8a
g.
Everyone-
Answering the format. Lior Malka Updated with links and progress: Balint Balint. |