==Roll call==
+
==Formal Meeting - 26th July 2010==
-
Everyone here except Colin Harwood, Colin Davie and Wendy Smith
+
-
==Research feedback==
+
*[[Team:Newcastle/Agendas/26_July_2010| Agenda]]
 +
====Roll call====
 +
*Everyone present except Da, Prof. Colin Harwood, Dr Colin Davie and Dr Wendy Smith
 +
 
 +
====Research feedback====
# Levan glue - Levan requires sucrose to work
# Levan glue - Levan requires sucrose to work
-
* Test how much sucrose is needed - Phil
+
#* Test how much sucrose is needed - Phil
# Kill switch - Use of ''mazE'' and ''mazF''
# Kill switch - Use of ''mazE'' and ''mazF''
-
* How much sucrose is needed for it to work?
+
#* How much sucrose is needed for it to work?
-
* How fast does the bug use up all the sucrose?
+
#* How fast does the bug use up all the sucrose?
# Stochastic switch - Use of ''hinC'' as the invertase
# Stochastic switch - Use of ''hinC'' as the invertase
-
* Matt to work with Phil to work out the probability of the switching
+
#* Matt to work with Phil to work out the probability of the switching
-
* Have to work out what is wrong with the iGEM 2009 stochastic switch first
+
#* Have to work out what is wrong with the iGEM 2009 stochastic switch first
# Gibson protocol
# Gibson protocol
-
* ''rocF'' to require 6 pair of primers, therefore try doing up 2 fragments first
+
#* ''rocF'' to require 6 pair of primers, therefore try doing up 2 fragments first
 +
# Protocol for ''yneA''
 +
#* Do up the characterization separately, one bacteria to contain ''yneA'' to show filamentous, the other to have the ''lacI''
 +
#* Could have nice photo with the different morphology on agar
 +
#* Do not shine UV light on during the gel extraction step to avoid DNA mutation
 +
#* Make up lots of DNA to allow better transformation
-
==Lab feedback==
+
====Lab feedback====
# Arginine test - Alan and Harsh
# Arginine test - Alan and Harsh
-
* Test worked fine.  
+
#* Test worked fine.  
-
* Could refine the test by using universal liquid pH indicator or to use the pH meter.
+
#* Could refine the test by using universal liquid pH indicator or to use the pH meter
# DNA extraction - Harsh and Racheal
# DNA extraction - Harsh and Racheal
-
* Could only confirm the result on 27.07.2010.
+
#* Could only confirm the result on 27.07.2010
-
==Wiki==
+
====Wiki====
-
* Not able to do the drop down menue with the shadow test, therefore could try using htm5.
+
* Not able to do the drop down menu with the shadow test, therefore could try using htm5
-
* Horizontal strip to change to purple.
+
* Horizontal strip to change to purple
-
==Visas==
+
====Visas====
-
* Deena to travel to London on 12.08.2010.
+
* Deena to travel to London on 12.08.2010
-
==Action point==
+
====Action point====
-
* Talk to Lalu - Phil and Harsh
+
* Talk to Louela - Phil and Harsh
* Email to iGEM HQ to get stickers and badges - Harsh
* Email to iGEM HQ to get stickers and badges - Harsh
 +
* Hyperlink the protocol page to the lab notebook
 +
* Lab wiki checker - Alan and Harsh
 +
* Send reminder to Jen to add Jane to the mailing list - Jannetta
 +
* Put CBCB and Biomedical school logo onto the wiki - Janetta
 +
* Write to Chris Voigt to get the source code - Steven
 +
* Tutorial for Inkscape - Jannetta
 +
* To check if the extra USA visa immigration form is valid for 2 years - Jen
 +
* Remind Neil about the MrGene logo - Steven
-
==Other business==
+
====Next meeting====
-
* If start later, email everyone first.
+
* Chair: Phil, Computer: Alan, Minutes: Rachel
-
 
+
* Next Wednesday, 3pm
-
==Action points==
+
-
* Write thank you letter to David Parker
+
-
* CEG logo on website
+
-
* Talk to Lula about funding
+
-
* Get back to Centre of Life person
+
-
* Contact Megan Lazara for iGEM badges and stickers
+
-
* Phil to send an email to Jill Green about Get Together
+
-
* Legends on figures(table caption goes on top, picture captions bottom), write on, description
+
-
* Create a page for cloning strategy like last year's
+
-
* Twitter feed
+
-
* Jannetta to change the gliffs
+
-
* What to do with yneA when it comes back
+
-
* Plan every step before going into lab
+
-
* Fill in wiki everyday for lab work
+
-
* Put down where we get protocols from
+
-
* Have a protocol page and link all experiments to that page
+
-
* Put Jane Calvert on iGEM mailing list
+
-
* Put all school logos on website
+
-
* Fill immigration form about 2 weeks before jamboree
+
-
 
+
-
==Next meeting==
+
-
* Steven is chair, Deena is computer, Alan is minutes
+
-
* Friday afternoon, 4pm.
+
{{Team:Newcastle/footer}}
{{Team:Newcastle/footer}}

Latest revision as of 01:36, 26 October 2010

iGEM Homepage Newcastle University BacillaFilla Homepage Image Map

Contents

Formal Meeting - 26th July 2010

Roll call

  • Everyone present except Da, Prof. Colin Harwood, Dr Colin Davie and Dr Wendy Smith

Research feedback

  1. Levan glue - Levan requires sucrose to work
    • Test how much sucrose is needed - Phil
  2. Kill switch - Use of mazE and mazF
    • How much sucrose is needed for it to work?
    • How fast does the bug use up all the sucrose?
  3. Stochastic switch - Use of hinC as the invertase
    • Matt to work with Phil to work out the probability of the switching
    • Have to work out what is wrong with the iGEM 2009 stochastic switch first
  4. Gibson protocol
    • rocF to require 6 pair of primers, therefore try doing up 2 fragments first
  5. Protocol for yneA
    • Do up the characterization separately, one bacteria to contain yneA to show filamentous, the other to have the lacI
    • Could have nice photo with the different morphology on agar
    • Do not shine UV light on during the gel extraction step to avoid DNA mutation
    • Make up lots of DNA to allow better transformation

Lab feedback

  1. Arginine test - Alan and Harsh
    • Test worked fine.
    • Could refine the test by using universal liquid pH indicator or to use the pH meter
  2. DNA extraction - Harsh and Racheal
    • Could only confirm the result on 27.07.2010

Wiki

  • Not able to do the drop down menu with the shadow test, therefore could try using htm5
  • Horizontal strip to change to purple

Visas

  • Deena to travel to London on 12.08.2010

Action point

  • Talk to Louela - Phil and Harsh
  • Email to iGEM HQ to get stickers and badges - Harsh
  • Hyperlink the protocol page to the lab notebook
  • Lab wiki checker - Alan and Harsh
  • Send reminder to Jen to add Jane to the mailing list - Jannetta
  • Put CBCB and Biomedical school logo onto the wiki - Janetta
  • Write to Chris Voigt to get the source code - Steven
  • Tutorial for Inkscape - Jannetta
  • To check if the extra USA visa immigration form is valid for 2 years - Jen
  • Remind Neil about the MrGene logo - Steven

Next meeting

  • Chair: Phil, Computer: Alan, Minutes: Rachel
  • Next Wednesday, 3pm
Newcastle University logo.png    Newcastle cbcb logo.pngNewcastle Biomedicine logo.gif    Team Newcastle CEG logo.gif
Newcastle iww logo.jpg  UNIPV Pavia Logo.gif  Newcastle BBSRC.gif    Newcastle Genevision logo.png Newcastle WelcomeTrust.jpg
FaceBook Icon