Team:Yale/Our Project/Notebook/Week 2
From 2010.igem.org
our project
lab notebook: week 2 (6/14-6/20)
- Monday 6/14--Redo of 6/11 assay of bacterial growth within a narrow copper(II) concentrations after analysis of data showed uniformly poor growth. See more/less
- Tuesday 6/15--Did work on design of primers for PCR of thiosulfate reducates gene & Biobrick synthesis planning + set-up test to see if cultures from 6/14 survived the copper exposure. See more/less
- Wednesday 6/16--checked on spotted cell survival assay, collected MOPS minimal media materials, started making component solutions See more/less
- Thursday 6/17--more minimal media work and meeting, started BL21 culture See more/less
- Friday 6/18--plasmid pSB74 arrived (!), already in some unspecified E coli, so plated them out. Transformed promoters (constitutive & IPTG inducible), terminator, and repressor (for inducible promoter) into BL21. Also ran BL21 copper growth assays for wide and narrow concentrations ranges. June the 19th--in which it is revealed that there was a transformation-fail Redid transformation, this time into LE392, set aside pSB74 containing cells in fridge See more/less
- Sunday 6/20--in evening inoculate 5 mL liquid cultures See more/less