Team:KAIST-Korea/Notebook/Diary/August

From 2010.igem.org

(Difference between revisions)
(August 1-8)
(August 1-8)
Line 45: Line 45:
</table>
</table>
 +
 +
<table width="100%" border="0" cellpadding="20px">
 +
<tr>
 +
<td>
== August 1-8 ==
== August 1-8 ==
&nbsp;&nbsp;In this period(waiting the gene synthesize period), we divided the iGEM work to three parts.  
&nbsp;&nbsp;In this period(waiting the gene synthesize period), we divided the iGEM work to three parts.  
Line 54: Line 58:
<br>&nbsp;&nbsp;For presentation team they made a short video. This video will be present before our main presentation for hook. It contains our motivation and our efforts and so on.
<br>&nbsp;&nbsp;For presentation team they made a short video. This video will be present before our main presentation for hook. It contains our motivation and our efforts and so on.
 +
</td>
 +
</tr>
 +
</table>
</tr>
</tr>
</table>
</table>

Revision as of 08:36, 8 August 2010

 


August 1-8

  In this period(waiting the gene synthesize period), we divided the iGEM work to three parts.

  • Modeling
  • BioBrick Design
  • Introduction vedio of the Presentation

  In case of modeling we found hundreds of other antibody sequence for comparing. We found a sequence of antibodies and run a program to find a structure of each antibody. After that we compare the similarity (numbers and figures) with structure alignment program. And we are searching for the mathmetical data that can help us to estimate our system's reaction rate and speed.
  In a meantime, bio brick team finished wiki design. they put contents on bio brick submittion page. We have 6 bio bricks so far and all has uproaded on our wiki page.
  For presentation team they made a short video. This video will be present before our main presentation for hook. It contains our motivation and our efforts and so on.