Team:Yale/Our Project/Notebook/Week 5

From 2010.igem.org

(Difference between revisions)
Line 100: Line 100:
<li>The diagnostic 1.0% agarose gel was run at 90 V vs. a 1 kb ladder. Each of the thirteen samples gave one diffuse band around 3 kb and no evidence of the 3.6 kb phsABC fragment, so both ligation attempts #1 and #2 were unsuccessful.</li>
<li>The diagnostic 1.0% agarose gel was run at 90 V vs. a 1 kb ladder. Each of the thirteen samples gave one diffuse band around 3 kb and no evidence of the 3.6 kb phsABC fragment, so both ligation attempts #1 and #2 were unsuccessful.</li>
-
       Gel of XbaI and SpeI double digest of plasmids from ligation attempts #1 and #2 Lane 1: 1 kb ladder, Lanes 2-5:1A-4A, Lanes 6-14: 1B-9B <br/>
+
 
 +
<div align="center">
 +
<img src="https://static.igem.org/mediawiki/2010/9/93/Yale-digest-gel.jpg" />
 +
</div>
 +
       <div id="caption">Gel of XbaI and SpeI double digest of plasmids from ligation attempts #1 and #2 Lane 1: 1 kb ladder, Lanes 2-5:1A-4A, Lanes 6-14: 1B-9B </div>
        
        
  <li>During digestion prepped plasmid samples for sequencing. Each sample contained 3 μL of plasmid soln (average concentration of 96 ng/μL), 2 μL of 4 mM VF2 (forward primer), and 13 μL of distilled water. Intended to follow up with reverse sequencing of more promising samples, but gel results made it a moot point. </li>
  <li>During digestion prepped plasmid samples for sequencing. Each sample contained 3 μL of plasmid soln (average concentration of 96 ng/μL), 2 μL of 4 mM VF2 (forward primer), and 13 μL of distilled water. Intended to follow up with reverse sequencing of more promising samples, but gel results made it a moot point. </li>

Revision as of 21:42, 27 October 2010

iGEM Yale

lab notebook: week 5 (7/5 -7/11)

  • Monday 7/5--Colony PCR of Ligation Attempt #2 Transformants
  • See more/less
  • Tuesday 7/6--Analysis of Results of Ligation Attempts 1 & 2
  • See more/less
  • Wednesday 7/7--Triple ligation attempt--promoter + thiosulfate reductase + terminator
  • See more/less
  • Thursday 7/8--Further ligation efforts
  • See more/less
  • Friday 7/9--Ligation attempt #4 to join phsABC and B0015 terminator.
  • See more/less
  • Saturday 7/10--Transformants from ligation attempts
  • See more/less
  • Sunday 7/11--Prep for copper growth assays of transformants
  • See more/less