Team:Newcastle/2 September 2010
From 2010.igem.org
(Difference between revisions)
Swoodhouse (Talk | contribs) (→Materials and Protocol) |
(→Preparation for pH acclimatisation of Bacillus subtilis 168) |
||
(5 intermediate revisions not shown) | |||
Line 1: | Line 1: | ||
{{Team:Newcastle/mainbanner}} | {{Team:Newcastle/mainbanner}} | ||
- | = | + | =Preparation for pH acclimatisation of ''Bacillus subtilis'' 168= |
We prepared 100mM of HEPES (it is a dibasic compound) at pH 7.0 and sent it for autoclaving. | We prepared 100mM of HEPES (it is a dibasic compound) at pH 7.0 and sent it for autoclaving. | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
{{Team:Newcastle/footer}} | {{Team:Newcastle/footer}} |
Latest revision as of 01:53, 28 October 2010
|
Preparation for pH acclimatisation of Bacillus subtilis 168
We prepared 100mM of HEPES (it is a dibasic compound) at pH 7.0 and sent it for autoclaving.