Team:Heidelberg/Notebook/Modeling
From 2010.igem.org
(Difference between revisions)
AlejandroHD (Talk | contribs) |
AlejandroHD (Talk | contribs) |
||
Line 31: | Line 31: | ||
==August== | ==August== | ||
- | ====First | + | ====First Week==== |
* Activation of MatLab-Accounts | * Activation of MatLab-Accounts | ||
* Start working on several tutorials | * Start working on several tutorials | ||
- | ====Second | + | ====Second Week==== |
* Meeting with Dr. König | * Meeting with Dr. König | ||
** Advantages and disadvantages of different modeling approaches | ** Advantages and disadvantages of different modeling approaches | ||
** Possibility to use Neuronal Networks and Support Vector Machines | ** Possibility to use Neuronal Networks and Support Vector Machines | ||
- | ====Third | + | ====Third Week==== |
* Activation of MatLab fuzzy logic toolbox | * Activation of MatLab fuzzy logic toolbox | ||
- | ====Fourth | + | ====Fourth Week==== |
* Meeting with Tim and Nao | * Meeting with Tim and Nao | ||
** Options to optimize a fuzzy logic model | ** Options to optimize a fuzzy logic model | ||
* Start of subproject miBSdesigner | * Start of subproject miBSdesigner | ||
- | |||
- | |||
* Telemeeting with Stephen Krämer | * Telemeeting with Stephen Krämer | ||
** Advantages and limitations of fuzzy logic | ** Advantages and limitations of fuzzy logic | ||
+ | |||
<html> | <html> | ||
<div class="backtop"> | <div class="backtop"> | ||
Line 56: | Line 55: | ||
</div> | </div> | ||
</html> | </html> | ||
+ | |||
==September== | ==September== | ||
- | ==== | + | ====First Week==== |
* Project miBEAT starts | * Project miBEAT starts | ||
** decision to create an interactive GUI on the wiki | ** decision to create an interactive GUI on the wiki | ||
Line 64: | Line 64: | ||
** Start of Neural Network model | ** Start of Neural Network model | ||
- | ==== | + | ====Second Week==== |
* Presentation of miBEAT project-concept in official team meeting | * Presentation of miBEAT project-concept in official team meeting | ||
- | |||
* mUTING subproject is started | * mUTING subproject is started | ||
- | ==== | + | ====Third Week==== |
* 6th Workshop on Computation of Biochemical Pathways and Genetic Networks | * 6th Workshop on Computation of Biochemical Pathways and Genetic Networks | ||
** Parameter estimation in fuzzy/noisy systems | ** Parameter estimation in fuzzy/noisy systems | ||
Line 75: | Line 74: | ||
** New approaches to spatial modeling | ** New approaches to spatial modeling | ||
** Computation of microRNA regulatory network | ** Computation of microRNA regulatory network | ||
- | |||
* Discussion with Professor Sanghamitra Bandyopadhyay from the Machine Intelligence Unit of the Indian Statistical Institute in Kolkata | * Discussion with Professor Sanghamitra Bandyopadhyay from the Machine Intelligence Unit of the Indian Statistical Institute in Kolkata | ||
** Advise to use a Rough set modeling approach | ** Advise to use a Rough set modeling approach | ||
- | ==== | + | ====Fourth Week==== |
+ | * miBS designer is finished | ||
* Project miRockdown Starts | * Project miRockdown Starts | ||
** Development of an modified miBS designer to be part of miBEAT | ** Development of an modified miBS designer to be part of miBEAT | ||
Line 86: | Line 85: | ||
==October== | ==October== | ||
+ | ====First Week==== | ||
+ | * Further development of the scripts for miBEAT | ||
+ | * mUTING is started | ||
+ | |||
+ | ====Second Week==== | ||
* Both models (neural network and fuzzy logic) are ready and waiting for data | * Both models (neural network and fuzzy logic) are ready and waiting for data | ||
* Planning for normalization strategies | * Planning for normalization strategies | ||
+ | |||
+ | ====Third Week==== | ||
* Designs of Binding Sites to be tested in wet lab | * Designs of Binding Sites to be tested in wet lab | ||
+ | * miRockdown is finished | ||
+ | |||
+ | ====Fourth Week==== | ||
+ | * Setting up the miBEAT GUI | ||
+ | * Writing of documentation and introduction to the project | ||
+ | * Fitting of models to the obtained data | ||
+ | |||
<html> | <html> | ||
<div class="backtop"> | <div class="backtop"> |
Latest revision as of 16:03, 27 October 2010
Modeling NotebookWelcome to the notebook of the modeling project. This notebook includes the work in four different tracks: miBEAT, miRockdown, miBS Designer and the model training set. April29.04.2010
July13.07.2010
30.07.2010
AugustFirst Week
Second Week
Third Week
Fourth Week
SeptemberFirst Week
Second Week
Third Week
Fourth Week
OctoberFirst Week
Second Week
Third Week
Fourth Week
|