Team:UPO-Sevilla/Notebook/07 23

From 2010.igem.org

(Difference between revisions)
 
Line 15: Line 15:
<html>
<html>
-
       <h1>July, 23th</h1>
+
       <h1>July, 23rd</h1>
       <h2>Production Team</h2>
       <h2>Production Team</h2>
Line 32: Line 32:
-
     <a class="return_button" href="/Team:UPO-Sevilla/Notebook/07_22" title="Go to 22th of July"><span>Go to 22th of July</span></a>
+
     <a class="return_button" href="/Team:UPO-Sevilla/Notebook/07_22" title="Go to 22nd of July"><span>Go to 22nd of July</span></a>
     <a class="next_button" href="/Team:UPO-Sevilla/Notebook/07_26" title="Go to 26th of July"><span>Go to 26th of July</span></a>
     <a class="next_button" href="/Team:UPO-Sevilla/Notebook/07_26" title="Go to 26th of July"><span>Go to 26th of July</span></a>

Latest revision as of 23:54, 25 October 2010

July, 23rd

Production Team

Paola Gallardo. We start with new SDM with the same genes.

David Caballero. Plate analysis: there were colonies but they were tiny to count it. We let them at 37ºC all day long in order to see bigger colonies.

Assembly Team

We did the last check of UPO1+2. UPO1+2 was digested with Nhe1 because UPO1 has two restriction sites and UPO2 lacks of them. If agarose gel electrophoresis shows the lineal form we ́ll have a positive candidate.

DryLab Team

Web: iGEM Spanish web released. Navigator compatibility developments worked on.

Go to 22nd of July Go to 26th of July
Return to Notebook

Footer