Team:KAIST-Korea/Notebook/Diary/September
From 2010.igem.org
(Difference between revisions)
(→September 2 ~ September 28) |
(→September 2 ~ September 28) |
||
(One intermediate revision not shown) | |||
Line 68: | Line 68: | ||
- | ==September 2 ~ September | + | ==September 2 ~ September 21 == |
- | + | <html> | |
We designed PCR schedules and do PCR experiment. When PCR result was not satisfied, then we repeated PCR experiment. There are PCR details on <a href=https://2010.igem.org/Team:KAIST-Korea/Project/Methods/PCR_Result>PCR experiment menu</a>. | We designed PCR schedules and do PCR experiment. When PCR result was not satisfied, then we repeated PCR experiment. There are PCR details on <a href=https://2010.igem.org/Team:KAIST-Korea/Project/Methods/PCR_Result>PCR experiment menu</a>. | ||
+ | </html> | ||
<br> | <br> | ||
<br> | <br> | ||
<br> | <br> |
Latest revision as of 07:21, 20 October 2010
September 1pREP41 vector has arrived. -> we will do E.coli transformation and increase its number. pREP42-GFP vector has arrived (in E.coli) -> will incubate a day and do spreading for further experiment. Making culture media
Culture
September 2 ~ September 21
We designed PCR schedules and do PCR experiment. When PCR result was not satisfied, then we repeated PCR experiment. There are PCR details on PCR experiment menu.
|