Team:KAIST-Korea/Notebook/Diary/October
From 2010.igem.org
(Difference between revisions)
Line 43: | Line 43: | ||
</tr> | </tr> | ||
</table> | </table> | ||
+ | == October 1 ~ October 5 == | ||
+ | <html> | ||
+ | We designed PCR schedules and do PCR experiment. When PCR result was not satisfied, then we repeated PCR experiment. There are PCR details on <a href=https://2010.igem.org/Team:KAIST-Korea/Project/Methods/PCR_Result>PCR experiment menu</a>. | ||
+ | </html> | ||
</tr> | </tr> | ||
- | |||
</table> | </table> | ||
- | |||
- | |||
- | |||
- |
Revision as of 07:23, 20 October 2010
October 1 ~ October 5We designed PCR schedules and do PCR experiment. When PCR result was not satisfied, then we repeated PCR experiment. There are PCR details on PCR experiment menu.
|