HKU-Hong Kong/21 July 2010
From 2010.igem.org
(Difference between revisions)
Line 1: | Line 1: | ||
- | {{:Team:HKU-Hong_Kong/ | + | {{:Team:HKU-Hong_Kong/header1}} |
- | ='''Work schedule 21 July 2010'''= | + | =='''Work schedule 21 July 2010'''== |
Gel purification(con't 20/7)was carried out to recover the biopart for ligation in pET28a. | Gel purification(con't 20/7)was carried out to recover the biopart for ligation in pET28a. | ||
Transformation was done. After 2 hours' recovery in SOC medium, the bacteria were cultured on LB plate with antibiotic K. | Transformation was done. After 2 hours' recovery in SOC medium, the bacteria were cultured on LB plate with antibiotic K. | ||
{{:Team:HKU-Hong_Kong/footer}} | {{:Team:HKU-Hong_Kong/footer}} |
Latest revision as of 18:23, 27 October 2010
| |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||
|
Work schedule 21 July 2010
Gel purification(con't 20/7)was carried out to recover the biopart for ligation in pET28a. Transformation was done. After 2 hours' recovery in SOC medium, the bacteria were cultured on LB plate with antibiotic K.