Team:Newcastle/Meetings/12 February 2010

From 2010.igem.org

(Difference between revisions)
(Shortlisting of Ideas)
 
(2 intermediate revisions not shown)
Line 1: Line 1:
{{Team:Newcastle/mainbanner}}
{{Team:Newcastle/mainbanner}}
-
=Informal Meeting 12 February 2010=
+
==Informal Meeting 12 February 2010==
-
Start Time: 4.00 p.m.
+
*Start Time: 4.00 p.m.
 +
*Attendance: Rachel (Chair), Richard (minutes), Zoltan (computer) Harsh, Younus, Da, Alan (late)
-
==Attendance==
+
====Summary of the last formal meeting====
-
Rachel (Chair), Richard (minutes), Zoltan (computer) Harsh, Younus, Da, Alan (late
+
-
 
+
-
==Summary of the last formal meeting==
+
* Showed supervisors timeline
* Showed supervisors timeline
-
* Ideas: Da: diabetes, Jannetta: optimal nitrogen fixation, Steve: error detection
+
* Ideas:  
-
* Modelling tutorial and hwk. Stephen has already put list of model entities on wiki
+
**Da: diabetes  
 +
**Jannetta: optimal nitrogen fixation  
 +
**Steve: error detection
 +
* Modelling tutorial and homework. Stephen has already put list of model entities on wiki
* All mobile numbers on Wiki apart from Richard (need new phone)
* All mobile numbers on Wiki apart from Richard (need new phone)
-
==Ideas==
+
====Ideas====
-
'''Zoltan''': Using bacteria to draw (French) flags. Move towards signal: light, electricity. Produce fluorescent colours. Need to think about practical applications.
+
*Zoltan: Using bacteria to draw (French) flags. Move towards signal: light, electricity. Produce fluorescent colours. Need to think about practical applications.
-
 
+
*Richard: ''Bacillus'' immune system. Largest problem is to overcome immune reaction
-
'''Richard''': Bacillus immune system. Largest problem is to overcome immune reaction
+
Linearisation of bacterial genome for kill-switch: need to re-engineer  the replication mechanism
Linearisation of bacterial genome for kill-switch: need to re-engineer  the replication mechanism
-
==Timeline==
+
====Shortlisting of Ideas====
-
Discussed about ranking system (1 worst: 10 best).  
+
*Discussed about ranking system (1 worst: 10 best).  
-
* Table. Shortlisting ~20 down to 5 on Wednesday. To 3 on Friday.  
+
** Table. Shortlisting ~20 down to 5 on Wednesday. To 3 on Friday.  
-
* Slide presentation for last 3 - divide team into groups of 3 (present as a group in front of AW and JH).  
+
** Slide presentation for last 3 - divide team into groups of 3 (present as a group in front of AW and JH).  
-
6 Criteria:
+
*6 Criteria:
-
* wow factor (impress judges) - “out of blue”
+
# wow factor (impress judges) - “out of blue”
-
* novelty (how new or fresh is idea)
+
# novelty (how new or fresh is idea)
-
* practicality in lab
+
# practicality in lab
-
* how much has already been done  
+
# how much has already been done  
-
* glass award potential
+
# glass award potential
-
* application in society
+
# application in society
-
Somebody needs to draft table for scoring.
+
*Somebody needs to draft table for scoring.
-
* Have send email to JH and NW asking them about the suitability of our 6 criteria.  
+
*Have send email to JH and NW asking them about the suitability of our 6 criteria.  
-
Each person only knows 27 of all previous projects. Need to create list and finalise criteria. To discuss with supervisors later.
+
*Each person only knows 27 of all previous projects. Need to create list and finalise criteria. To discuss with supervisors later.
-
==Homework for modelling tutorial==
+
====Homework for modelling tutorial====
* Took picture of modelling lac operon network.  
* Took picture of modelling lac operon network.  
-
==Action points==
+
====Action points====
* All: Put all ideas up on ideas page by next meeting. 14+ ideas so far
* All: Put all ideas up on ideas page by next meeting. 14+ ideas so far
* Zoltan: Data mining results to copy and paste onto original page (Main page > previous projects > Zoltan)
* Zoltan: Data mining results to copy and paste onto original page (Main page > previous projects > Zoltan)
Line 47: Line 47:
* Richard: add ideas to ideas page
* Richard: add ideas to ideas page
* Remind NW and JH about selection of remaining two team members
* Remind NW and JH about selection of remaining two team members
-
* Next meeting early on Wed 17th at 3.00
+
* Next meeting Wed 17th at 3.00 p.m.
-
 
+
* Chair: Younus, Minutes: Jannetta, Da: computer
-
* Younnis: scribe
+
-
* Jannetta: Chair
+
-
* Da: computer
+

Latest revision as of 22:30, 25 October 2010

iGEM Homepage Newcastle University BacillaFilla Homepage Image Map

Contents

Informal Meeting 12 February 2010

  • Start Time: 4.00 p.m.
  • Attendance: Rachel (Chair), Richard (minutes), Zoltan (computer) Harsh, Younus, Da, Alan (late)

Summary of the last formal meeting

  • Showed supervisors timeline
  • Ideas:
    • Da: diabetes
    • Jannetta: optimal nitrogen fixation
    • Steve: error detection
  • Modelling tutorial and homework. Stephen has already put list of model entities on wiki
  • All mobile numbers on Wiki apart from Richard (need new phone)

Ideas

  • Zoltan: Using bacteria to draw (French) flags. Move towards signal: light, electricity. Produce fluorescent colours. Need to think about practical applications.
  • Richard: Bacillus immune system. Largest problem is to overcome immune reaction

Linearisation of bacterial genome for kill-switch: need to re-engineer the replication mechanism

Shortlisting of Ideas

  • Discussed about ranking system (1 worst: 10 best).
    • Table. Shortlisting ~20 down to 5 on Wednesday. To 3 on Friday.
    • Slide presentation for last 3 - divide team into groups of 3 (present as a group in front of AW and JH).
  • 6 Criteria:
  1. wow factor (impress judges) - “out of blue”
  2. novelty (how new or fresh is idea)
  3. practicality in lab
  4. how much has already been done
  5. glass award potential
  6. application in society
  • Somebody needs to draft table for scoring.
  • Have send email to JH and NW asking them about the suitability of our 6 criteria.
  • Each person only knows 27 of all previous projects. Need to create list and finalise criteria. To discuss with supervisors later.

Homework for modelling tutorial

  • Took picture of modelling lac operon network.

Action points

  • All: Put all ideas up on ideas page by next meeting. 14+ ideas so far
  • Zoltan: Data mining results to copy and paste onto original page (Main page > previous projects > Zoltan)
  • Zoltan: will put photo of homework model network on wiki.
  • All: New ideas allowed before Wednesday. Bring list of own ideas from wiki for next meeting.
  • Richard: add ideas to ideas page
  • Remind NW and JH about selection of remaining two team members
  • Next meeting Wed 17th at 3.00 p.m.
  • Chair: Younus, Minutes: Jannetta, Da: computer