Team:Calgary/13 September 2010

From 2010.igem.org

(Difference between revisions)
Line 9: Line 9:
Today I did a restriction digest of all the miniprepped colonies for DegP systems with EcoRI and SpeI. It looked like the construction worked but I will do a PCR of the plasmids before sending them off to sequencing.
Today I did a restriction digest of all the miniprepped colonies for DegP systems with EcoRI and SpeI. It looked like the construction worked but I will do a PCR of the plasmids before sending them off to sequencing.
 +
 +
 +
<u>Emily</u>
 +
 +
Today I made overnight cultures of my malE31 colonies that I think might be biobricked and in the AK Vector.  I will miniprep these tomorrow and then proceed with a verification restriction digest.  Tonight I also helped Chris and Jeremy clean up some things in the lab.
 +
}}
}}

Revision as of 16:26, 14 September 2010

Monday September 13, 2010

Himika's restriction digest of DegP system with EcoRI/ SpeI
Himika's restriction digest of DegP system with EcoRI/ SpeI

Himika

Today I did a restriction digest of all the miniprepped colonies for DegP systems with EcoRI and SpeI. It looked like the construction worked but I will do a PCR of the plasmids before sending them off to sequencing.


Emily

Today I made overnight cultures of my malE31 colonies that I think might be biobricked and in the AK Vector. I will miniprep these tomorrow and then proceed with a verification restriction digest. Tonight I also helped Chris and Jeremy clean up some things in the lab.