Team:Calgary/13 September 2010
From 2010.igem.org
(Difference between revisions)
H.dastidar (Talk | contribs) |
Emily Hicks (Talk | contribs) |
||
Line 9: | Line 9: | ||
Today I did a restriction digest of all the miniprepped colonies for DegP systems with EcoRI and SpeI. It looked like the construction worked but I will do a PCR of the plasmids before sending them off to sequencing. | Today I did a restriction digest of all the miniprepped colonies for DegP systems with EcoRI and SpeI. It looked like the construction worked but I will do a PCR of the plasmids before sending them off to sequencing. | ||
+ | |||
+ | |||
+ | <u>Emily</u> | ||
+ | |||
+ | Today I made overnight cultures of my malE31 colonies that I think might be biobricked and in the AK Vector. I will miniprep these tomorrow and then proceed with a verification restriction digest. Tonight I also helped Chris and Jeremy clean up some things in the lab. | ||
+ | |||
}} | }} |
Revision as of 16:26, 14 September 2010
Monday September 13, 2010
Himika
Today I did a restriction digest of all the miniprepped colonies for DegP systems with EcoRI and SpeI. It looked like the construction worked but I will do a PCR of the plasmids before sending them off to sequencing.
Emily
Today I made overnight cultures of my malE31 colonies that I think might be biobricked and in the AK Vector. I will miniprep these tomorrow and then proceed with a verification restriction digest. Tonight I also helped Chris and Jeremy clean up some things in the lab.