BIOTEC Dresden/Notepad/12 October 2010

From 2010.igem.org

Revision as of 07:32, 21 October 2010 by Charansam21 (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Parts Assembly

Minipreps of the overnight cultures were done and the same were given for sequencing in order to confirm the presence of the desired insert.

52a, 52b, 52c


July
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
August
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
September
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
October
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Share to Twitter Share to Facebook Share to Orkut Stumble It Email This More...