Team:DTU-Denmark/Notebook
From 2010.igem.org
Home | The Team | The Project | Parts submitted | Modelling | Notebook | Blog |
You can't spell funding without fun... (Annemi) - 25/06/10I had a look at some funding and where we should go from here.
Birthday and fun day at the lab? (Maya, Anja, and Patrick) - 24/06/10So today was yet another day in the lab, only difference being it was my birthday (Patrick). :D Progress (Maya, Anja, and Patrick) - 23/06/10So we started in the lab yesterday after having gotten all the needed information from Flemming concerning the FP's (fluorescence proteins). iGEM the last 2 weeks - 21/06/10So the last 2 weeks have been quite hectic and busy, and if you're wondering why there hasn't been an update its because alot of things keep coming up while working on the design. Maya, Anja, Malthe and Patrick's log - 08/06/10We have finished the step-wise construction of our system, and have begun on the in-silico model. Maya and Patrick's log - 07/06/10So today we have been working on the step-wise construction of our system, taking into account how to test each part along the way. We learned a lot about recombineering and the factors entailed in the process and have come up with the initial version of how we are going to construct the system.
We have also uploaded Sebastien's presentations from last week, and they can be found in the folder "Presentations from Sebastien" in the research group folder as well. So, from all the work today we are trying to make a scheme of phases / phase planning of the construction parts that need to be completed in a described order that will be uploaded possibly within this week. Captain's log 040610Maya, Thomas, Patrick, Lisa and Annemi have been working on a project description for Sebastien. The document 'project description' can be found in dropbox in the research group folder. From now on this document will be the only one describing the project, therefore you should edit in the document and not create a new one. We have decided that every time we are doing something iGEM related, that it should be posted in this document. Please write the date and your name at the beginning of your log. This will make it easier for all of us to keep track of what is going on in the group. We have tried to make a simple plan of what needs to be done before going to the lab:
Maya will start creating an illustration for the system during the weekend. Thomas will delete all irrelevant budgets from the dropbox. He will also send the project description to Sebastien. |
Lab Work and Notebook
On this page is described the experiments, procedures and protocols that we have used.
Further the Results from relevant experiments are presented.
We have written succeses as well as failures to share our experience, knowledge and tips n' tricks we learned while working with our BBrick parts and the BB-standards and methods.
Protocols
For all the methods we have shaped the protocols to the standards and experiences of our lab.
We have collected the protocols we used in a comprehensive list below where it is possible to read them in full length. They contain our procedure as well as references. Some time this might be weakly documented when given to us by communication with supervisors.
Generel experiences
General experiments and procedures that both groups have used.
Biobrick assemply standards
standard.
3A.
PCR
Repressor group
more specific characterizing experiments the biobrick
Work flow
XXXX maybe show pictures of our work plan, or write it simplified - the more pictures the better XXX
Experiment I
what method what results
Experiment II
what method what results
Terminator group
XXXX here we should write a short abstract XXXX
Work flow
XXXX maybe show pictures of our work plan, or write it simplified - the more pictures the better XXX
Experiment I
what method what results
Experiment II
what method what results
Protocols
List of the protocols we used, and links to the word documents We should have references in our protocols, when available.
References and resources
- xxxxxxxxxxxx