October
4/10/2010
- digest of 8 fragments with BsaI-HF @ 37°C for 1hr
- 6x2ul of F1-8
- 3ul NEB4 10x
- 3ul BSA 10x
- 11ul H2O
- 1ul BsaI-HF
- purification with Nucleotide Removal Kit
- NanoDrop concentration check:
Fragment 1
| Fragment 2
| Fragment 3
| Fragment 4
| Fragment 5
| Fragment 6
| Fragment 7
| Fragment 8
|
35.5 ng/ul
| 43.5 ng/ul
| 43.0 ng/ul
| 43.0 ng/ul
| 79.0 ng/ul
| 51.0 ng/ul
| 63.0 ng/ul
| 44.0 ng/ul
|
5/10/2010
- assembly started with Quick ligase kit
- ~200ng of fragment DNA per reaction
- ligation time ~10min
15/10/2010
- Fragments 1-4; 5-8 assembly.
- ligation time 20-25min @ 16°C
- 60ul of beads
- 60ul Anchor solution (Nanodrop - 196ng/ul)
- 2x wash with 100ul w/b buffer
- 1x wash with 100ul 1x T4 ligase buffer
- gentle flicking only to dissolve the bead pellet from the wall
- 1 - fragments 1-4 assembly.
- 2 - fragments control.
- 3 - assembly ligation mix
M - DNA 1kb ladder
- 4 - fragments 5-8 assembly.
- 5 - fragments control.
- 6 - assembly ligation mix
18/10/2010
Gel map:
- M - DNA 1kb ladder
- 1 - control (fragments 1-4 from AAV1).
- 2 - fragments 1-4 assembly
- 3 - fragments 1-4 assembly (2nd reaction)
- 4 - negative control
25/10/2010
- ViroByte PCR with Phusion High-Fidelity Hot Start
PCR was set up as follows:
10 ul Phusion HF Buffer 5x
1ul of dNTP
0.5 ul of 100 um primers
2 ul of AAV template
36 ul of water
................................................
98 °C/45 s
................................................ (1x
98 °C/15 s
72 °C/30 s
................................................ (35x)
72 °C/10 min
................................................
4 °C/ hold
fragments 5-8 of AAV2 and 1-8 of AAV6
26/10/2010
- Fragment digest, Bsa1, 3hrs, purified from gel
- 7ul fragment DNA
- 3ul NEB4 10x
- 3ul BSA 10x
- 1ul Bsa1
- 16ul nuclease free water
27/10/2010
AAV 1 fragments 1-4; 5-8 and 1-8 (full capsid) assembly
Touchdown Phusion HiFi PCR was performed according to the following protocol:
................................................
98 °C/30s
................................................ (1x
98 °C/15 s
72 °C/15 s (- 1.0 °C/cycle)
72 °C/1 min
................................................ (17x)
98 °C/15 s
55 °C/30 s
72 °C/1 min
................................................ (20x)
72 °C/10 min
................................................ (1x)
4 °C/ hold
................................................
- Gel loading scheme:
- M - GeneRuler 1kb DNA ladder
- F 1-4 - fragments 1-4 assembly
- F 5-8 - fragments 5-8 assembly
- F 1-8 - fragments 1-8 assembly
- C 1-4 - fragments 1-4 control
- C 5-8 - fragments 5-8 control
- C 1-8 - fragments 1-8 control