Team:ETHZ Basel/Internal
From 2010.igem.org
(Difference between revisions)
(→Track selection) |
|||
Line 2: | Line 2: | ||
{{ETHZ_Basel10_Empty}} | {{ETHZ_Basel10_Empty}} | ||
- | = | + | = Internal = |
+ | This section will be removed before wiki-freeze! | ||
- | = | + | == Lab == |
- | = Track selection = | + | == Modeling == |
+ | |||
+ | == Track selection == | ||
Think about the Track selection! | Think about the Track selection! | ||
Here are the possibilities and a short summary of the 2009 team than won this award: | Here are the possibilities and a short summary of the 2009 team than won this award: |
Revision as of 13:16, 13 September 2010
Internal
This section will be removed before wiki-freeze!
Lab
Modeling
Track selection
Think about the Track selection! Here are the possibilities and a short summary of the 2009 team than won this award:
- Best Food and Energy Project: UNIPV-Pavia. They tried to produce ethanol from cheese whey
- Best Environmental Project: Cambridge. Pigment production in E.coli
- Best Health and Medicine Project: Stanford. A Probiotic Approach to Diagnosing and Treating Inflammatory Bowel Disease.
- Best Manufacturing Project: Imperial College London. The E.ncapsulator, a versatile manufacture and delivery platform by which therapeutics can be reliably targeted to the intestine.
- Best New Application Area: Valencia. iLCD, iGEM Lighting Cell Display.
- Best Foundation Advance: Alberta. A Synthetic Biology Tool Kit for Artificial Genome Design and Construction.
- Best Information Processing Project: TUDelft. Bacterial Relay Race, a cell-to-cell communication system that allows the propagation of a set of instructions coded on a plasmid, and not just binary information as in quorum sensing.
- Best Software Tool: Berkeley Software & Illinois-Tools (Tie). Eugene, Spectacles, and Kepler: Managing Synthetic Biology Device Development.
According to the group meeting on Monday, August 9th, the track choice is either best new application area or best information processing project. A final decision will be taken once the deadline date is announced.
Update September 10th: The final decision regarding track selection will be done during the next team meeting, Thursday, September 16th.