Team:EPF Lausanne/Calendar/0728

From 2010.igem.org

(Difference between revisions)
(New page: {{EPFL_2010_calendar_day}} <div CLASS="EPFL_calendar_content"> = 28 July 2010 = Empty yet but it will be filled soon, don't worry ;) </div> <html> <table style="width: 100%"> <tr> <...)
(28 July 2010)
 
Line 4: Line 4:
= 28 July 2010 =
= 28 July 2010 =
-
Empty yet but it will be filled soon, don't worry ;)
+
*Analysis of plating of transformed cells
 +
*Gel for check the Colony PCR
 +
*250 ml Gly medium
 +
*OD measurement of preculture for competent Asaia --> too high. Start a new one!!!
 +
*Competent Asaia and stocking @-80°C
 +
*Plating of transformed E.Coli for double check
 +
 
 +
*preparation of the pellets for infection with 3 different species of bacteria + OD measurements
 +
*preparation of tubes with 15 female flies
 +
*begin of the survival experiment: infection of flies --> check of the flies after 2h
</div>
</div>

Latest revision as of 15:41, 28 July 2010


28 July 2010

  • Analysis of plating of transformed cells
  • Gel for check the Colony PCR
  • 250 ml Gly medium
  • OD measurement of preculture for competent Asaia --> too high. Start a new one!!!
  • Competent Asaia and stocking @-80°C
  • Plating of transformed E.Coli for double check
  • preparation of the pellets for infection with 3 different species of bacteria + OD measurements
  • preparation of tubes with 15 female flies
  • begin of the survival experiment: infection of flies --> check of the flies after 2h

Previous day Next day