Week13 9/5/10-9/11/10

From 2010.igem.org

(Difference between revisions)
(9/7/10)
 
Line 5: Line 5:
===9/6/10===
===9/6/10===
Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room.
Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room.
 +
 +
----
===9/7/10===
===9/7/10===
Line 11: Line 13:
===9/8/10===
===9/8/10===
-
********
+
Day Off
----
----
===9/9/10===
===9/9/10===

Latest revision as of 02:10, 27 October 2010

Week13 Highlights

We began reorganizing our lab space and equipment in preparation for a fall quarter class that would be utilizing the majority of the lab. We attempted standard assembly of LacP-RBS-CHS3 because the presence of a P site in CHS3 prevented 3A assembly.


9/6/10

Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room.


9/7/10

Day Off


9/8/10

Day Off


9/9/10

Assembled LacP-RBS1-CHS3 in a Chlor backbone plasmid using standard assembly methods Cut LacP-RBS1 using S Cut CHS3 using X and S (50% chance of inserting backwards --> must select for this after)


9/10/10

Inoculated 20 LacP-RBS-CHS3 cells.

Assembled CP-LacPI-RFP parts into Tet backbone.