Week13 9/5/10-9/11/10

From 2010.igem.org

(Difference between revisions)
(New page: ===9/6/10=== Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room. Thanks! ...)
(9/6/10)
Line 1: Line 1:
===9/6/10===
===9/6/10===
-
Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room. Thanks!
+
Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room.
===9/7/10===
===9/7/10===

Revision as of 22:39, 16 October 2010

Contents

9/6/10

Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room.

9/7/10


9/8/10


9/9/10

Assembled LacP-RBS1-CHS3 in a Chlor backbone plasmid using standard assembly methods Cut LacP-RBS1 using S Cut CHS3 using X and S (50% chance of inserting backwards --> must select for this after)


9/10/10

Inoculated 20 LacP-RBS-CHS3 cells.

Assembled CP-LacPI-RFP parts into Tet backbone.