Team:ETHZ Basel/Biology/Notes

From 2010.igem.org

(Difference between revisions)
(statusstatus of project)
Line 4: Line 4:
= [[Team:ETHZ_Basel/Lab/status|status of project]] =
= [[Team:ETHZ_Basel/Lab/status|status of project]] =
-
= preparation of biobricks =
+
 
= [[Team:ETHZ_Basel/Lab/journal|journal]] =
= [[Team:ETHZ_Basel/Lab/journal|journal]] =

Revision as of 11:56, 6 August 2010

protocols

status of project

journal

05.08.2010

  • digest of cheB-A, cheB-C, cheR-A, cheR-C, cyFP-A, cyFP-C, tetR-A with Aar1
  • gel of digest, see results
  • gel extraction of cheB-A, cheB-C, cyFP-A and tetR-A
  • miniprep of PIF3-A, PIF3-C, PhyB-C, Trig-A

06.08.2010

  • inoculation of cheR-A, cheR-C, cyFP-A and cyFP-C since the digest of 05.08.10 didn't work out very nicely

results

05.08.2010

  • gel of digest of cheB-A, cheB-C, cheR-A, cheR-C, cyFP-A, cyFP-C, tetR-A with Aar1
digest with Aar1.