HKU-Hong Kong/21 July 2010
From 2010.igem.org
(Difference between revisions)
Line 1: | Line 1: | ||
+ | {{:Team:HKU-Hong_Kong/header}} | ||
='''Work schedule 21 July 2010'''= | ='''Work schedule 21 July 2010'''= | ||
Gel purification(con't 20/7)was carried out to recover the biopart for ligation in pET28a. | Gel purification(con't 20/7)was carried out to recover the biopart for ligation in pET28a. | ||
Transformation was done. After 2 hours' recovery in SOC medium, the bacteria were cultured on LB plate with antibiotic K. | Transformation was done. After 2 hours' recovery in SOC medium, the bacteria were cultured on LB plate with antibiotic K. | ||
- | + | {{:Team:HKU-Hong_Kong/footer}} | |
- | + | ||
- | + | ||
- | + |
Revision as of 18:09, 27 October 2010