Team:Aberdeen Scotland/Curve Fitting

From 2010.igem.org

(Difference between revisions)
Line 3: Line 3:
<html>
<html>
-
<h1>Curve Fitting to find the Hill Coefficient of the GFP/Bbox-stem Association (n<sub style="font-size:15px">2</sub>)</h1>
+
<h1>Curve Fitting to find the Hill Coefficient for the GFP/Bbox-stem Association (n<sub style="font-size:15px">2</sub>)</h1>
-
 
+
 +
<p>Based on a graph in a paper by Witherell et al.<sup style="font-size:15px">[14]</sup> which showed the binding curves of the MS2 stem loop we could calculate the value for n<sub style="font-size:15px">2</sub>. Our two MS2 stem loops (see Fig 1 in Equations) are 19 nucleotides apart, so our binding curve will most closely resemble that of the 8-16 construct, shown in figure 5A (filled squares).</p>
</html>
</html>

Revision as of 10:31, 20 October 2010

University of Aberdeen - ayeSwitch - iGEM 2010

Curve Fitting to find the Hill Coefficient for the GFP/Bbox-stem Association (n2)

Based on a graph in a paper by Witherell et al.[14] which showed the binding curves of the MS2 stem loop we could calculate the value for n2. Our two MS2 stem loops (see Fig 1 in Equations) are 19 nucleotides apart, so our binding curve will most closely resemble that of the 8-16 construct, shown in figure 5A (filled squares).