Week13 9/5/10-9/11/10

From 2010.igem.org

(Difference between revisions)
(9/6/10)
Line 1: Line 1:
 +
__NOTOC__
 +
===Week12 Summary===
 +
We began reorganizing our lab space and equipment in preparation for a fall quarter class that would be utilizing the majority of the lab. We attempted standard assembly of LacP-RBS-CHS3 because the presence of a P site in CHS3 prevented 3A assembly.
 +
----
===9/6/10===
===9/6/10===
Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room.
Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room.

Revision as of 22:42, 16 October 2010

Week12 Summary

We began reorganizing our lab space and equipment in preparation for a fall quarter class that would be utilizing the majority of the lab. We attempted standard assembly of LacP-RBS-CHS3 because the presence of a P site in CHS3 prevented 3A assembly.


9/6/10

Kevin did some reorganizing to get the lab back in order for Prof. Mordacq's class this fall. He consolidated the bench space, the -20 refrigerator and the cold room.

9/7/10


9/8/10


9/9/10

Assembled LacP-RBS1-CHS3 in a Chlor backbone plasmid using standard assembly methods Cut LacP-RBS1 using S Cut CHS3 using X and S (50% chance of inserting backwards --> must select for this after)


9/10/10

Inoculated 20 LacP-RBS-CHS3 cells.

Assembled CP-LacPI-RFP parts into Tet backbone.