Team:UPO-Sevilla/Notebook/09 13

From 2010.igem.org

(Difference between revisions)
(New page: <div class=globalBC> {{:Team:UPO-Sevilla/header}} <!-- --> <html> <head> <script type="text/javascript" language="javascript"> <!-- current("notebook","http...)
 
(2 intermediate revisions not shown)
Line 19: Line 19:
       <h2>Assembly Team</h2>
       <h2>Assembly Team</h2>
-
       <p>We put inocula of (1+2) and (16+3).</p>
+
       <p>We set up inocula of (1+2) and (16+3).</p>
 +
 
 +
      <h2>Assay Team</h2>
 +
 
 +
      <p>Eventually the assay was an unqualified failure and we didn’t achieve any positive result. We should study why it has happened and change some things to adjust properly the assay.</p>
 +
 
 +
      <p>The results are still wrong. We suspect our K12 strains’ motility so we prepared an assay in soft agar to demonstrate it.</p>
 +
 
 +
    <a class="return_button" href="/Team:UPO-Sevilla/Notebook/09_10" title="Go to 10th of September"><span>Go to 10th of September</span></a>
 +
 
 +
    <a class="next_button" href="/Team:UPO-Sevilla/Notebook/09_14" title="Go to 14th of September"><span>Go to 14th of September</span></a>
 +
 
 +
    <div class="clear"></div>
    
    
     <a class="return_button" href="/Team:UPO-Sevilla/Notebook" title="Notebook"><span>Return to Notebook</span></a>
     <a class="return_button" href="/Team:UPO-Sevilla/Notebook" title="Notebook"><span>Return to Notebook</span></a>

Latest revision as of 23:53, 25 October 2010

September, 13th

Assembly Team

We set up inocula of (1+2) and (16+3).

Assay Team

Eventually the assay was an unqualified failure and we didn’t achieve any positive result. We should study why it has happened and change some things to adjust properly the assay.

The results are still wrong. We suspect our K12 strains’ motility so we prepared an assay in soft agar to demonstrate it.

Go to 10th of September Go to 14th of September
Return to Notebook

Footer