Team:UPO-Sevilla/Notebook/09 02

From 2010.igem.org

Revision as of 12:18, 24 October 2010 by Lepavgom (Talk | contribs)

September, 2nd

Assembly Team

We analyzed 1+19 and 16+3 with different restriction enzymes and results shown no positives.

Owing to a technical hitch we could not keep on our work. There was a problem with the air conditioning and at 35ºC it is not possible to do molecular biology.

Go to 1st of September Go to 3rd of September
Return to Notebook

Footer