Team:UPO-Sevilla/Notebook/09 02

From 2010.igem.org

(Difference between revisions)
(New page: <div class=globalBC> {{:Team:UPO-Sevilla/header}} <!-- --> <html> <head> <script type="text/javascript" language="javascript"> <!-- current("notebook","http...)
Line 15: Line 15:
<html>
<html>
-
       <h1>September, 02nd</h1>
+
       <h1>September, 2nd</h1>
       <h2>Assembly Team</h2>
       <h2>Assembly Team</h2>
Line 23: Line 23:
       <p>Owing to a technical hitch we could not keep on our work. There was a problem with the air conditioning and at 35ºC it is not possible to do molecular biology.</p>
       <p>Owing to a technical hitch we could not keep on our work. There was a problem with the air conditioning and at 35ºC it is not possible to do molecular biology.</p>
      
      
 +
 +
    <a class="return_button" href="/Team:UPO-Sevilla/Notebook/09_01" title="Go to 1st of September"><span>Go to 1st of September</span></a>
 +
 +
    <a class="next_button" href="/Team:UPO-Sevilla/Notebook/09_03" title="Go to 3rd of September"><span>Go to 3rd of September</span></a>
 +
 +
    <div class="clear"></div>
    
    
     <a class="return_button" href="/Team:UPO-Sevilla/Notebook" title="Notebook"><span>Return to Notebook</span></a>
     <a class="return_button" href="/Team:UPO-Sevilla/Notebook" title="Notebook"><span>Return to Notebook</span></a>

Revision as of 12:18, 24 October 2010

September, 2nd

Assembly Team

We analyzed 1+19 and 16+3 with different restriction enzymes and results shown no positives.

Owing to a technical hitch we could not keep on our work. There was a problem with the air conditioning and at 35ºC it is not possible to do molecular biology.

Go to 1st of September Go to 3rd of September
Return to Notebook

Footer