Team:Newcastle/Meetings/22 September 2010
From 2010.igem.org
(Difference between revisions)
Shethharsh08 (Talk | contribs) (→Next meeting) |
|||
Line 1: | Line 1: | ||
{{Team:Newcastle/mainbanner}} | {{Team:Newcastle/mainbanner}} | ||
- | + | ==Formal meeting - 22 September 2010== | |
- | + | ||
- | + | ||
+ | *Chair: Younus, Minutes: Harsh, Computer: Steven | ||
- | ==Roll call== | + | ===Roll call=== |
- | + | ||
* Apologies: Da, Rachel, Phil, Alan and Deena | * Apologies: Da, Rachel, Phil, Alan and Deena | ||
* Absence: Colin Harwood, Colin Davie and Jem Stach | * Absence: Colin Harwood, Colin Davie and Jem Stach | ||
+ | |||
* Concrete has been made, set in tubes. | * Concrete has been made, set in tubes. | ||
Line 15: | Line 14: | ||
* Wiki design is ready. | * Wiki design is ready. | ||
- | ==Lab feedback== | + | ===Lab feedback=== |
* There should be red colonies on E. coli plates. | * There should be red colonies on E. coli plates. | ||
* pSpac and Hyperspank is expected to fully express in E. coli. | * pSpac and Hyperspank is expected to fully express in E. coli. | ||
Line 22: | Line 21: | ||
* iGEM letter plates - gaps left in the sucrose agar filled with cells producing glue and the sand is sticking to the glue, showing the letters. If the plates are turned over, the sand still remains attached. | * iGEM letter plates - gaps left in the sucrose agar filled with cells producing glue and the sand is sticking to the glue, showing the letters. If the plates are turned over, the sand still remains attached. | ||
- | ==Concrete== | + | ===Concrete=== |
* Cement is still at 37°C for a day. | * Cement is still at 37°C for a day. | ||
* Make dilute solution containing cells and dip the end of the concrete (dry) in it and let it dry out and send it to EM lab. | * Make dilute solution containing cells and dip the end of the concrete (dry) in it and let it dry out and send it to EM lab. | ||
- | ==Modelling== | + | ===Modelling=== |
Flux balance analysis on wiki by next week | Flux balance analysis on wiki by next week | ||
- | ==27th October Deadlines== | + | ===27th October Deadlines=== |
*Project and part documentation due, including documentation for all medal criteria | *Project and part documentation due, including documentation for all medal criteria | ||
*BioBrick Part DNA needs TO BE RECEIVED by the Registry | *BioBrick Part DNA needs TO BE RECEIVED by the Registry | ||
Line 35: | Line 34: | ||
*Wiki FREEZE at 11:59 pm, EDT (Eastern Daylight Time = UTC−4) So 3:59 am here | *Wiki FREEZE at 11:59 pm, EDT (Eastern Daylight Time = UTC−4) So 3:59 am here | ||
- | ==Action points== | + | ===Action points=== |
* Keep on bombarding emails to RMIT and GeorgiaTech tonight itself- Harsh and Steve. | * Keep on bombarding emails to RMIT and GeorgiaTech tonight itself- Harsh and Steve. | ||
*Check the deadline for the DNA submission- Younus | *Check the deadline for the DNA submission- Younus | ||
Line 45: | Line 44: | ||
* Sort out helping other teams. | * Sort out helping other teams. | ||
- | ==Next meeting== | + | ===Next meeting=== |
*Provisional date and time: | *Provisional date and time: | ||
*Chair: , Minutes: , Computer: | *Chair: , Minutes: , Computer: | ||
{{Team:Newcastle/footer}} | {{Team:Newcastle/footer}} |
Revision as of 17:14, 25 October 2010
|
Contents |
Formal meeting - 22 September 2010
- Chair: Younus, Minutes: Harsh, Computer: Steven
Roll call
- Apologies: Da, Rachel, Phil, Alan and Deena
- Absence: Colin Harwood, Colin Davie and Jem Stach
- Concrete has been made, set in tubes.
- We went to the EM facility, won't be a problem to take photos of our concrete.
- Wiki design is ready.
Lab feedback
- There should be red colonies on E. coli plates.
- pSpac and Hyperspank is expected to fully express in E. coli.
- Arabinose stands a better chance at winning.
- Arabinose repressor in pSB1AK3. Has to go into B. subtilis 168.
- iGEM letter plates - gaps left in the sucrose agar filled with cells producing glue and the sand is sticking to the glue, showing the letters. If the plates are turned over, the sand still remains attached.
Concrete
- Cement is still at 37°C for a day.
- Make dilute solution containing cells and dip the end of the concrete (dry) in it and let it dry out and send it to EM lab.
Modelling
Flux balance analysis on wiki by next week
27th October Deadlines
- Project and part documentation due, including documentation for all medal criteria
- BioBrick Part DNA needs TO BE RECEIVED by the Registry
- Judging form due
- Wiki FREEZE at 11:59 pm, EDT (Eastern Daylight Time = UTC−4) So 3:59 am here
Action points
- Keep on bombarding emails to RMIT and GeorgiaTech tonight itself- Harsh and Steve.
- Check the deadline for the DNA submission- Younus
- Start with the judging form (Absolutely important)
- Characterization has to be on the registry and not on the wiki.
- Prepare the talk for the 15th Oct. as it is very important- Everyone
- Also start preparing the poster. Do it in parallel with the presentation- Everyone
- Write an email to iGEM headquarters for the badges - Harsh
- Sort out helping other teams.
Next meeting
- Provisional date and time:
- Chair: , Minutes: , Computer: