Team:Freiburg Software/Notebook

From 2010.igem.org

(Difference between revisions)
 
(4 intermediate revisions not shown)
Line 10: Line 10:
background: #666666;
background: #666666;
border: none;
border: none;
 +
}
 +
.main_area {
 +
background: transparent url(http://) repeat-y scroll top left;
}
}
</style>
</style>
Line 19: Line 22:
<h1>Notebook</h1>
<h1>Notebook</h1>
-
</html>
 
<h1>April</h1>
<h1>April</h1>
Line 284: Line 286:
<p class="main">Updated Notebook and meeting pages of the wiki to HTML style to maintain consistency and made some spelling corrections in some parts of the wiki.</p>
<p class="main">Updated Notebook and meeting pages of the wiki to HTML style to maintain consistency and made some spelling corrections in some parts of the wiki.</p>
-
<html>
+
<h2><font style="font-size: 12px;">Oct. 27&28 2010</font></h2>
 +
<i><p class="main">Whole Team</p></i>
 +
<p class="main">The last days before the wiki freeze the whole team worked hard and stayed up till early morning to get the wiki finished. </p>
 +
 
</div>
</div>
</html>
</html>

Latest revision as of 03:14, 28 October 2010

Notebook

April

Apr. 6 2010

Paul, Jörg

As Google has introduced its new APIv2 and is going to break backwards compatibility to version 1 soon, we are working hard to port SynBioWave to the new API. We have rewritten most of the code of the SynBioWave-Robot, and we were able to implement several major improvements using new possibilities of the APIv2.

Apr. 13 2010

Paul, Jörg

Menu-events now trigger callback-functions, which further simplifies robot-programming and results in much cleaner code. As the state of a gadget can now be updated without reloading the gadget completely every time, we are using this feature to provide a smoother menu. We use the new “Active API” to improve upload integration.

Apr. 20 2010

Paul, Jörg

we are currently writing a detailed guide for SynBioWave-Robot programming and will post it on the project site.

May

May. 10 2010

Paul, Jörg

Developer guide is available, so programming additional robots using the SynBioWave Robot would be easier.

June

Jun. 06 2010

Paul, Jörg

The new Attachmend-API greatly simplifies the up- and download of sequences. Sequences attached to a wave (at least those in common formats) using wave’s generic file attachment functionality are automatically imported.

Jun. 10 2010

Paul, Jörg, kristian

We have new members in Team now. Fabian Haas, Paresh Paradkar and Niklas Meinzer joined Freiburg_Software Team. We gave an introduction to them about iGEM and SynBioWave.

July

Jul. 05 2010

Paresh, Niklas

Started developing primary versions of the robots.

Jul. 16 2010

Fabian

Paresh Paradkar and Niklas Meinzer have now got their accounts for WIKI.

August

Aug. 03 2010

Paresh, Fabian

We discussed about the US visa form and concerned formalities.

September

Sep. 16 2010

Niklas

Set up the BLAST Robot (Robot Registration) and started research on BLAST APIs

Sep. 17 2010

Paresh

Discussed the first version of Translation Robot with team and received inputs for further improvements.

Sep. 18 2010

Niklas

Set up the Alignment Robot and implemented a first Alignment Algorithm

Sep. 19 2010

Niklas

Improved Code Reusability by redesigning the Alignment Robot

Sep. 20 2010

Paresh, Fabian, Niklas

Went to Frankfurt for Visa application, created Project abstract and agreed on a title

Sep. 21 2010

Niklas, Fabian

created Wiki outline, checked gold mouse pad requirements

Sep. 22 2010

Niklas

Continued Work on Needleman/Wunsch Alignment, now custom cost functions are available

Sep. 25 2010

Niklas

Added Smith/Waterman Algorithm to Alignment Robot

Sep. 30 2010

Niklas

Implemented the first Version of the PrimerDesigner (synbiowave-primerdesigner@appspot.com)

October

Oct. 1 2010

Paresh, Fabian

Improved the Translation Robot. The output shows now the Frame no. in a clearer way. * Also, Paresh made the output more comfortable for users by adding length, start and end positions of ORFs. * We discused the basic functionality of REBase-Robot (Restcritionenzym).

Oct. 3 2010

Niklas

Continued Work on Primer Designer. Now calculation the melting points according to Oligocalc as recommended by Volker. I furthermore resolved the issues I had with the Display Gadget and the Sequences are displayed in right order.
TODO: Make sure the melting points of both primers are about the same, implement RFCs and make designed Primers available for downloading.

Oct. 4 2010

Paresh

Started working on restrictionsites robot.

Oct. 5 2010

Niklas, Fabian

Primer design:

  • describe the Sequence with their names
  • a input matrix for the position where the primer should start
  • implement binary search for primer position

Alignment:

  • show Start - End - position

Database:

  • Import via BioJava

Oct. 6 2010

Niklas

Started writing the User Guide for the Add-on Robots

Paresh

Changed translation robot to color the ORF in the output. Received inputs regarding the restriction sites from team.

Oct. 7 2010

Niklas

Improved the synbiowave base classes SequenceUtils and Sequence and adjusted the Addon Robots to them. Also fixed a bug in the alignment robot.

Oct. 8 2010

Niklas

Experimented with Gadgets to make our Robots more interactive. Created a simple Button Gadget and included it in Primerdesigner: Now the user can store the Primers in the workspace by clicking a button.

Oct. 8 2010

Niklas

Improved the Primerdesigner Gadget: User can now enter a custom name for the primers before they get stored in Workspace.

Fabian

Made some icons for the robots.

Oct. 9 2010

Paresh

Improved the translation robot to show all frames one under the other using new methods in SequenceUtils class.

Niklas

Created a Robot that can download any part from parts registry and add it to the workspace.

Oct. 11 2010

Paresh

Improved the translation robot to output frames faster. Wrote own translation method for converting DNA to amino acids

Niklas

Did some research on the low performace and tweaked the Display functions resulting in a huge performance gain.

Oct. 12 2010

Niklas

Updated the Main Robot and included all library files edited in the past weeks into the synbiowave library; released synbiowave-V2-001.jar as the new developer library. Also the Main Robot now uses the new XML parser to import parts from part registry.

Fabian

Designed logos and icons.

Oct. 13 2010

Niklas

Fixed a bug in Abstract Robot: The robot now checks if the gadget is the MainMenu before he tries to evaluate it, which enables us to use other interactive Gadgets. (New abstract robot can be found in synbiowave-V2-002.jar on svn)

Reviewed the Primerdesigner: No RFC Prefixes are available, but start and stop point. Also the Primers are now no longer wrong way.

Fabian

Wrote pages for the wiki and made some Homepage designs.

Paresh

Changed the translation robot to find multiple ORFs per frame.

Oct. 14 2010

Niklas

Made the following fileformats available in the Download section: FASTA, Genbank, EMBL

Fabian

Wrote pages for the wiki.

Paresh

Started working on likelihood robot.

Oct. 15 2010

Niklas

Imported BioBricks can now be stored into workspace via ButtonClick.Continued Work on BLAST Robot: Finally found a good solution, now using NCBI Blast URL API.

Oct. 16 2010

Niklas

Created a "waiter" Gadget, that waits for the BLAST results to avoid robot timeouts.

Fabian

Uploaded the homepage layout to the official wiki.

Oct. 17 2010

Niklas

Continued working on the BLAST robot: Wrote an XML-Parser for the ncbi blast results. They are now beeing displayed in the wave

Fabian

Bought a new laptop especially for iGEM ;)

Oct. 19 2010

Fabian

Homepage: Made some new designs.

Niklas

Started writing content for the wiki.

Oct. 20 2010

Fabian

Homepage: designd the page "Home".

Oct. 22 2010

Fabian

Made the Team Page. Wrote some standard classes.

Oct. 23 2010

Fabian

Made the Team portrait and some images.

Oct. 24 2010

Fabian

Uploaded data to the wiki. Wrote text for the Team page.

Oct. 25 2010

Fabian

Tried to implement a javascript into the wiki for a slideshow... The slideshow looks...hmmm. Uploaded the pictutes to Picasa.

Oct. 26 2010

Fabian

Uploaded data and text to the wiki.

Niklas

Wrote the Human Practise part of the wiki.

Paresh

Updated Notebook and meeting pages of the wiki to HTML style to maintain consistency and made some spelling corrections in some parts of the wiki.

Oct. 27&28 2010

Whole Team

The last days before the wiki freeze the whole team worked hard and stayed up till early morning to get the wiki finished.