Team:Davidson-MissouriW/Notebook

From 2010.igem.org

(Difference between revisions)
(Prototype team page)
 
(61 intermediate revisions not shown)
Line 1: Line 1:
-
<!-- *** What falls between these lines is the Alert Box!  You can remove it from your pages once you have read and understood the alert *** -->
+
{{Template_Wiki}}
 +
<div style="padding:10px">
 +
==Notebook==
 +
'''May 25, 2010 to May 29, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Davidson traveled to Missouri Western and further discussed project ideas</li>
 +
</ul>
 +
<br>
 +
'''June 1, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Tested to find lethal concentration of Tet in plated and liquid mediums</li>
 +
<li>Verified RCBS with our sequences and researched codon optimization methods</li>
 +
<li>Analyzed probabilities for constructs A and B</li>
 +
<li>Learned lab protocols and organized lab
 +
<li>Created list of needed parts and parts we need
 +
</ul>
 +
<br>
 +
'''June 2, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Mini prepped, diagnostic RP digest, preparative digest, ligation, pBAD+RBS-RFP </li>
 +
<li>Researched different ways to optimize a gene</li>
 +
<li>Began simulation for Constructs A and B</li>
 +
<li>Learned miniprep and digestion protocols
 +
<li>Learned how to document gels
 +
</ul>
 +
<br>
 +
'''June 3, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Mini prepped, diagnostic RP digest, preparative digest, ligation, pBAD+RBS-RFP </li>
 +
<li>Researched restriction sites and created proposal for gene optimization</li>
 +
<li>Continued work on simulation in Java and Matlab</li>
 +
<li>Learned about biobrick restriction sites and sticky ends
 +
<li>Ordered lox oligos
 +
</ul>
 +
<br>
 +
'''June 4, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Mini prepped RBS-TetA-TT
 +
<li>RX Fragment digestion for RBS-TetA-TT
 +
<li>Analyzed the optimization of tetA sequence and researched properties of Lox sites
 +
<li>Debugged Simulations
 +
<li>Sent off parts for sequencing
 +
<li>Learned the transformation protocol
 +
</li>
 +
</ul>
 +
<br>
 +
'''June 7, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Ligate and plasmid check for pSB1A2 or pSB1AK3
 +
<li>Began working to improve the Lancelator and created histograms for simulations
 +
</li>
 +
<li>Gel purified vector for lox ligations
 +
<li>Divided up constructs to be ligated
 +
</ul>
 +
<br>
 +
'''June 8, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Double digest on pBAD-RBS-RFP to make an RS fragment insert </li>
 +
<li>Worked on a Perl program that check for Bio Brick Restriction Sites
 +
<li>Analyzed sequencing results using ApE program
 +
<li>BOUGHT HAWAIIAN SHIRTS!!!!!
 +
</ul>
 +
<br>
 +
'''June 9, 2010'''
 +
<hr>
 +
<ul>
 +
<li>EcoRI and PstI digest on pLac and pBad colonies
 +
<li>Arabinose and IPTG concentration experiments started </li>
 +
<li>Continued work on the Lancelator program and began working on a different simulation for Construct C and D
 +
<li>Annealed lox oligos together
 +
<li>Gel purified pBad+RBS+Cre (“Cre construct” from 2010 igem kit plate)
 +
</ul>
 +
<br>
 +
'''June 10, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Picked 14 colonies from pLac-RBS-RFP and pLac-RBS-RFP-RBS plates
 +
<li> Started inducer curve experiments</li>
 +
<li>Linked Lancelator code to the website and continued simulations
 +
<li>Performed ligations involving lox sites
 +
</ul>
 +
<br>
 +
'''June 11, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Ligated S03736 into pSB1A7 vector
 +
<li>EcoRI/PstI digest on pLac-RBS-RFP-RBS colonies</li>
 +
<li>Added new features to the Lancelator and worked on numerically representing Construct C for the Matlab simulation
 +
<li>Performed colony PCR screening for the first ligations
 +
</ul>
 +
<br>
 +
'''June 14, 2010'''
 +
<hr>
 +
<ul>
 +
<li>EcoRI/PstI diagnostic digest performed on pBad-RBS-RFP colonies 
 +
<li>Inducer curve experiment started on pBad and pLac constructs </li>
 +
<li>Debugged Lancelator and finished numerical representation for the simulation
 +
<li>Size verified lox forward and lox reverse sites
 +
<li>Ligated “cre construct” into low, medium, and high copy kanamycin resistant vectors
 +
</ul>
 +
<br>
 +
'''June 15, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Ligated pLac-RBS-RFP + RBS-TetA
 +
<li>IPTG experiment started on pLacI-RBS-RFP </li>
 +
<li>Worked on the color schemes for the new Oligator
 +
<li>Created a new construct that might be helpful for the biologists
 +
<li>Planning for Amp+Tet experiments
 +
<li>First “cre construct” ligations failed
 +
</ul>
 +
<br>
 +
'''June 16, 2010'''
 +
<hr>
 +
<ul>
 +
<li>EcoRI/PstI diagnostic digest performed on pLac-RBS-RFP in pSB1A7 vector
 +
<li>IPTG experiment started on plates with pLac and pLacI constructs </li>
 +
<li>Began working on a Java code that will run simulations for all the constructs
 +
<li>Researched on NP-Complete problems
 +
<li>Religated “cre construct”
 +
<li>Lox sites sent off for sequencing
 +
</ul>
 +
<br>
 +
'''June 17, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Flourimeter data collected from IPTG experiment
 +
<li>Ligated pLacI-RBS-RFP + RBS-TetA </li>
 +
<li>Worked on graphics of the Java program
 +
<li>Studied specific NP-Complete problems and brainstormed ways to incorporate them in our project
 +
<li>Lox sites were frozen down and entered in GCAT-alog
 +
<li>Agar plates were prepared for Amp+Tet experiments
 +
</ul>
 +
<br>
 +
'''June 18, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Picked 4 colonies from pLacI-RBS-RFP-RBS-TetA plates
 +
<li>IPTG experiment started using newly created IPTG  </li>
 +
<li>Debugged the Java program
 +
<li>Created a new page for the GCAT server
 +
<li>Planned kanamycin experiments
 +
</ul>
 +
<br>
 +
'''June 21, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Digested TetA with EcoRI/NheI
 +
<li>Annealed oligos for optimized and deoptimized TetA segment 1  </li>
 +
<li>Improved the Java program
 +
<li>Began categorizing the knapsack problem into subparts
 +
<li>Successfully ligated ptet+different lox sites
 +
<li>Planned different combinations of variant lox sites
 +
</ul>
 +
<br>
 +
'''June 22, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Ligated annealed TetA oligos into digested TetA
 +
<li>Inducer curve experiment started on pLac and pLacI constructs  </li>
 +
<li>Added buttons to the java program
 +
<li>Brainstormed biological implications in different NP-Complete problems
 +
<li>Confirmed successful ligations of lox sites from sequencing results
 +
<li>First pilot test for Amp+Tet experiments
 +
</ul>
 +
<br>
 +
'''June 23, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Preparative NheI/BamHI digest performed on TetA
 +
<li>Preparative EcoRI/NheI digest performed on TetA </li>
 +
<li>Restructuring and reorganizing the Java program
 +
<li>Reviewed numerical algorithms and its relation to NP-Complete problems
 +
<li>Researched data on possible transcription terminator in Tet A
 +
<li>Failure of cre experiments
 +
</ul>
 +
<br>
 +
'''June 24, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Annealed optimized and deoptimized segment 1 TetA ligated into vector
 +
<li>Annealed optimized and deoptimized segment 2 TetA ligatied into vector</li>
 +
<li>Added weight characteristic to the fluorescent proteins in the Java code
 +
<li>Continued exploration of NP-Complete problems
 +
<li>Ligations to construct tet constructs
 +
</ul>
 +
<br>
 +
'''June 27, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Inducer curve experiment started on pLac and pLacI constructs
 +
<li>Picked colonies from TetA segment 1 & 2 optimized & deoptimized plates </li>
 +
<li>Added histograms to the Java Code
 +
<li>Researched and analyzed the effectiveness of Cre
 +
<li>Size verification of ptet+variant lox sites
 +
</ul>
 +
<br>
 +
'''June 28, 2010'''
 +
<hr>
 +
<ul><li>Added the option for the user to input the weights of the various modules and began work on custom construct builder
 +
<li>Picked colonies from TetA segment 1 & 2 optimized & deoptimized plates </li>
 +
<li>Planned to ligate pBad+RBS+Cre in ampicillin resistant vectors
 +
<li>Researched plasmid partitioning
 +
</ul>
 +
<br>
 +
'''June 29, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Screened segment 1 optimized and deoptimized candidate clones using RFLP
 +
<li>Screened segment 2 optimized and deoptimized candidate clones using RFLP </li>
 +
<li>Finished the simulation program and exported it
 +
<li>Explored the set covering problem
 +
<li>Researched applications of the knapsack problem in cryptography
 +
<li>Ligated ptet+LoxP+RBS+RFP
 +
</ul>
 +
<br>
 +
'''June 30, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Tet titration experiment performed on pLac and pLacI +RBS-RFP-RBS-TetA
 +
<li>Ligated TetA onto pLac and pLacI +RBS-RFP-RBS-TetA with no terminator  </li>
 +
<li>Some final work on the simulation program
 +
<li>Discussed new ideas such as integer programming
 +
<li>PCR screening of “RFP construct”
 +
<li>Ptet+variant lox sites were frozen down
 +
</ul>
 +
<br>
 +
'''July 1, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Preparative BamHI/NheI digest performed on TetA
 +
<li>New experiment protocol developed for reduced vector background noise  </li>
 +
<li>Added terminators to the program
 +
<li>Ran test trials of the program and analyzed its results
 +
<li>Planned experiments for using Cre as “front” and “back” vector
 +
<li>Ligated first “floxed” constructs
 +
</ul>
 +
<br>
 +
'''July 2, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Mini prepped, diagnostic RP digest, preparative digest, ligation, pBAD+RBS-RFP </li>
 +
<li>Continued work on the categorization of the knapsack problem
 +
<li>Researched Instant Insanity problem
 +
<li>PCR screening for “floxed constructs”
 +
</ul>
 +
<br>
 +
'''July 6, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Ligated S04446 and S04447 to J31007
 +
<li>Tet titration experiment performed on pLac and pLacI +RBS-RFP-RBS-TetA </li>
 +
<li>Added direction of terminators in the simulation
 +
<li>Researched cryptography application
 +
<li>Size verified “floxed constructs”
 +
<li>Digested “Cre construct” as front and back vector
 +
</ul>
 +
<br>
 +
'''July 7, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Ligated S04448 to RBS-TetA
 +
<li>Ligated S04449 to RBS-TetA</li>
 +
<li>Fixed memory leak in the simulation program
 +
<li>Researched integer programming
 +
<li>Sent off “floxed constructs" for sequencing
 +
<li>Ligated “floxed constructs” into pBad+RBS+Cre as “front” and “back” vector 
 +
</ul>
 +
<br>
 +
'''July 8, 2010'''
 +
<hr>
 +
<ul>
 +
<li>IPTG experiment started using pre-induced method 
 +
<li>IPTG experiment started using varying levels of tetracycline  </li>
 +
<li>Worked on animation for the simulation and continued analysis of the results of the simulation
 +
<li>Discussed integer programming as a group
 +
<li>Data suggests something wrong with “cre construct”
 +
</ul>
 +
<br>
 +
'''July 9, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Picked optimized and deoptimized TetA colonies
 +
<li>Flourimeter data collected from IPTG experiment  </li>
 +
<li>Revised some features on the program
 +
<li>Began working on theoretical probability models of the different constructs
 +
<li>Further experiments with “cre construct”
 +
</ul>
 +
<br>
 +
'''July 10, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Used RFLP to screen for candidate TetA clones
 +
<li>Transformed various pLac and pLacI constructs into MG1655 cells </li>
 +
<li>Experiments suggest pBad+RBS+Cre from iGem 2010 kit plate is incorrect
 +
</ul>
 +
<br>
 +
'''July 12, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Used RFLP to screen for candidate TetA clones
 +
<li>Transformed various pLac and pLacI constructs into MG1655 cells </li>
 +
<li>Added slider feature to the simulation program
 +
<li>Continued work on the theoretical probability model for Construct A of size 3
 +
<li>Tested “cre construct” from 2009 iGem kit plate
 +
</ul>
 +
<br>
 +
'''July 13, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Used RFLP to screen for candidate TetA clones
 +
<li>EcoRI/PstI diagnostic digest performed on K199150 </li>
 +
<li>Added custom prefixes and suffixes to the Oligator
 +
<li>Found a general equation for finding theoretical probabilities for Construct A of size 3
 +
<li>Sent off “floxed sites for sequencing”
 +
</ul>
 +
<br>
 +
'''July 14, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Ligated segment 2 optimized and deoptimzed TetA behind segment 1
 +
<li>IPTG experiment started on I715039-1 and I715039-2 </li>
 +
<li>Began analyzing MW optimization code
 +
<li>Finished theoretical probabilities for Construct A of size 3
 +
<li>Cre construct from 2009 plate was incorrect as well
 +
</ul>
 +
<br>
 +
'''July 15, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Cell count data collected from IPTG experiments
 +
<li>Flourimeter data collected from IPTG experiments </li>
 +
<li>Worked on a separate program using the CAI equation
 +
<li>Began working on theoretical probabilities for Construct A of size 4
 +
<li>Ligated more “floxed constructs”
 +
</ul>
 +
<br>
 +
'''July 16, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Tet titration experiment started using pSB3T5 vector
 +
<li>Tet titration experiment started using optimized and deoptimized TetA </li>
 +
<li>Added changes to the optimizer code
 +
<li>Researched how to solve a system of recursive relations into closed form
 +
<li>Decided to ligate cre into pBad+RBS and pLac+RBS
 +
</ul>
 +
<br>
 +
'''July 19, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Cell count data collected from Tet titrations
 +
<li>Tet titration experiment started using optimized and deoptimized TetA </li>
 +
<li>Fixed the error in the CAI optimization program
 +
<li>Continued analyzing systems of recursive relations
 +
<li>Ligated pBad+RBS+Cre and pLac+RBS+Cre
 +
</ul>
 +
<br>
 +
'''July 20, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Flourimeter data collected on IPTG experiment </li>
 +
<li>Adapted the Oligator page for the Optimization program, now called the Optimus
 +
<li>Made progress on solving the system of recursive relations that we have
 +
<li>Performed IPTG and tet experiments
 +
<li>PCR screened both “cre constructs”
 +
<li>pBad+RBS+Cre ligation unsuccesful
 +
</ul>
 +
<br>
 +
'''July 21, 2010'''
 +
<hr>
 +
<ul>
 +
<li>IPTG experiment started on optimized and deoptmized TetA constructs
 +
<li>Passage I715039-1 and I715039-2 experiments started  </li>
 +
<li>Started to link the ruby program on the webpage
 +
<li>Finished theoretical probabilities for Construct A of size 4
 +
<li>"Floxed constructs" ligated into pLac+RBS+Cre
 +
</ul>
 +
<br>'''July 22, 2010'''
 +
<hr>
 +
<ul>
 +
<li>IPTG experiment started using varying tetracycline concentrations
 +
<li>Cell count data collected on IPTG TetA experiment </li>
 +
<li>Linked the Optimus on the webpage
 +
<li>Started theoretical probabilities for Construct A of size 5
 +
<li>Cre was religated into pBad+RBS
 +
</ul>
 +
<br>
 +
<br>'''July 23, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Cell count data collected from IPTG experiment
 +
<li>Flourimeter data collected from IPTG experiment </li>
 +
<li>Worked on the tutorial for the Optimus and added various features
 +
<li>Worked on a Matlab tool based on the pancake problem that can find the theoretical probabilities of different modules in different positions
 +
<li>Last of the “floxed constructs” were ligated
 +
</ul>
 +
<br>
 +
<br>'''July 26, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Missouri traveled to Davidson to work on wiki and presentation materials
 +
<li>The two campuses reunite and share recent findings </li>
 +
</ul>
 +
<br>
 +
<br>'''July 27, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Began work on the team wiki </li>
 +
</ul>
 +
<br>
 +
<br>'''October 25, 2010'''
 +
<hr>
 +
<ul>
 +
<li>Finalizing team wiki </li>
 +
</ul>
 +
<br>
<html>
<html>
-
<div id="box" style="width: 700px; margin-left: 137px; padding: 5px; border: 3px solid #000; background-color: #fe2b33;">
+
<center><a href="#main_wrapper">top</a></center>
-
<div id="template" style="text-align: center; font-weight: bold; font-size: large; color: #f6f6f6; padding: 5px;">
+
</html>
-
This is a template page. READ THESE INSTRUCTIONS.
+
</div>
</div>
-
<div id="instructions" style="text-align: center; font-weight: normal; font-size: small; color: #f6f6f6; padding: 5px;">
 
-
You are provided with this team page template with which to start the iGEM season.  You may choose to personalize it to fit your team but keep the same "look." Or you may choose to take your team wiki to a different level and design your own wiki.  You can find some examples <a href="https://2008.igem.org/Help:Template/Examples">HERE</a>.
 
-
</div>
 
-
<div id="warning" style="text-align: center; font-weight: bold; font-size: small; color: #f6f6f6; padding: 5px;">
 
-
You <strong>MUST</strong> have a team description page, a project abstract, a complete project description, a lab notebook, and a safety page.  PLEASE keep all of your pages within your teams namespace. 
 
-
</div>
 
-
</div>
 
-
</html>
 
-
 
-
<!-- *** End of the alert box *** -->
 
-
 
-
 
-
{|align="justify"
 
-
|You can write a background of your team here.  Give us a background of your team, the members, etc.  Or tell us more about something of your choosing.
 
-
|[[Image:Davidson-MissouriW_logo.png|200px|right|frame]]
 
-
|-
 
-
|
 
-
''Tell us more about your project.  Give us background.  Use this is the abstract of your project.  Be descriptive but concise (1-2 paragraphs)''
 
-
|[[Image:Davidson-MissouriW_team.png|right|frame|Your team picture]]
 
-
|-
 
-
|
 
-
|align="center"|[[Team:Davidson-MissouriW | Team Example]]
 
-
|}
 
-
 
-
<!--- The Mission, Experiments --->
 
-
 
-
{| style="color:#1b2c8a;background-color:#0c6;" cellpadding="3" cellspacing="1" border="1" bordercolor="#fff" width="62%" align="center"
 
-
!align="center"|[[Team:Davidson-MissouriW|Home]]
 
-
!align="center"|[[Team:Davidson-MissouriW/Team|Team]]
 
-
!align="center"|[https://igem.org/Team.cgi?year=2010&team_name=Davidson-MissouriW Official Team Profile]
 
-
!align="center"|[[Team:Davidson-MissouriW/Project|Project]]
 
-
!align="center"|[[Team:Davidson-MissouriW/Parts|Parts Submitted to the Registry]]
 
-
!align="center"|[[Team:Davidson-MissouriW/Modeling|Modeling]]
 
-
!align="center"|[[Team:Davidson-MissouriW/Notebook|Notebook]]
 
-
!align="center"|[[Team:Davidson-MissouriW/Safety|Safety]]
 
-
|}
 
-
 
-
 
-
==Notebook==
 
-
 
-
You should make use of the calendar feature on the wiki and start a lab notebook.  This may be looked at by the judges to see how your work progressed throughout the summer.  It is a very useful organizational tool as well.
 

Latest revision as of 04:33, 26 October 2010

Notebook

May 25, 2010 to May 29, 2010


  • Davidson traveled to Missouri Western and further discussed project ideas


June 1, 2010


  • Tested to find lethal concentration of Tet in plated and liquid mediums
  • Verified RCBS with our sequences and researched codon optimization methods
  • Analyzed probabilities for constructs A and B
  • Learned lab protocols and organized lab
  • Created list of needed parts and parts we need


June 2, 2010


  • Mini prepped, diagnostic RP digest, preparative digest, ligation, pBAD+RBS-RFP
  • Researched different ways to optimize a gene
  • Began simulation for Constructs A and B
  • Learned miniprep and digestion protocols
  • Learned how to document gels


June 3, 2010


  • Mini prepped, diagnostic RP digest, preparative digest, ligation, pBAD+RBS-RFP
  • Researched restriction sites and created proposal for gene optimization
  • Continued work on simulation in Java and Matlab
  • Learned about biobrick restriction sites and sticky ends
  • Ordered lox oligos


June 4, 2010


  • Mini prepped RBS-TetA-TT
  • RX Fragment digestion for RBS-TetA-TT
  • Analyzed the optimization of tetA sequence and researched properties of Lox sites
  • Debugged Simulations
  • Sent off parts for sequencing
  • Learned the transformation protocol


June 7, 2010


  • Ligate and plasmid check for pSB1A2 or pSB1AK3
  • Began working to improve the Lancelator and created histograms for simulations
  • Gel purified vector for lox ligations
  • Divided up constructs to be ligated


June 8, 2010


  • Double digest on pBAD-RBS-RFP to make an RS fragment insert
  • Worked on a Perl program that check for Bio Brick Restriction Sites
  • Analyzed sequencing results using ApE program
  • BOUGHT HAWAIIAN SHIRTS!!!!!


June 9, 2010


  • EcoRI and PstI digest on pLac and pBad colonies
  • Arabinose and IPTG concentration experiments started
  • Continued work on the Lancelator program and began working on a different simulation for Construct C and D
  • Annealed lox oligos together
  • Gel purified pBad+RBS+Cre (“Cre construct” from 2010 igem kit plate)


June 10, 2010


  • Picked 14 colonies from pLac-RBS-RFP and pLac-RBS-RFP-RBS plates
  • Started inducer curve experiments
  • Linked Lancelator code to the website and continued simulations
  • Performed ligations involving lox sites


June 11, 2010


  • Ligated S03736 into pSB1A7 vector
  • EcoRI/PstI digest on pLac-RBS-RFP-RBS colonies
  • Added new features to the Lancelator and worked on numerically representing Construct C for the Matlab simulation
  • Performed colony PCR screening for the first ligations


June 14, 2010


  • EcoRI/PstI diagnostic digest performed on pBad-RBS-RFP colonies
  • Inducer curve experiment started on pBad and pLac constructs
  • Debugged Lancelator and finished numerical representation for the simulation
  • Size verified lox forward and lox reverse sites
  • Ligated “cre construct” into low, medium, and high copy kanamycin resistant vectors


June 15, 2010


  • Ligated pLac-RBS-RFP + RBS-TetA
  • IPTG experiment started on pLacI-RBS-RFP
  • Worked on the color schemes for the new Oligator
  • Created a new construct that might be helpful for the biologists
  • Planning for Amp+Tet experiments
  • First “cre construct” ligations failed


June 16, 2010


  • EcoRI/PstI diagnostic digest performed on pLac-RBS-RFP in pSB1A7 vector
  • IPTG experiment started on plates with pLac and pLacI constructs
  • Began working on a Java code that will run simulations for all the constructs
  • Researched on NP-Complete problems
  • Religated “cre construct”
  • Lox sites sent off for sequencing


June 17, 2010


  • Flourimeter data collected from IPTG experiment
  • Ligated pLacI-RBS-RFP + RBS-TetA
  • Worked on graphics of the Java program
  • Studied specific NP-Complete problems and brainstormed ways to incorporate them in our project
  • Lox sites were frozen down and entered in GCAT-alog
  • Agar plates were prepared for Amp+Tet experiments


June 18, 2010


  • Picked 4 colonies from pLacI-RBS-RFP-RBS-TetA plates
  • IPTG experiment started using newly created IPTG
  • Debugged the Java program
  • Created a new page for the GCAT server
  • Planned kanamycin experiments


June 21, 2010


  • Digested TetA with EcoRI/NheI
  • Annealed oligos for optimized and deoptimized TetA segment 1
  • Improved the Java program
  • Began categorizing the knapsack problem into subparts
  • Successfully ligated ptet+different lox sites
  • Planned different combinations of variant lox sites


June 22, 2010


  • Ligated annealed TetA oligos into digested TetA
  • Inducer curve experiment started on pLac and pLacI constructs
  • Added buttons to the java program
  • Brainstormed biological implications in different NP-Complete problems
  • Confirmed successful ligations of lox sites from sequencing results
  • First pilot test for Amp+Tet experiments


June 23, 2010


  • Preparative NheI/BamHI digest performed on TetA
  • Preparative EcoRI/NheI digest performed on TetA
  • Restructuring and reorganizing the Java program
  • Reviewed numerical algorithms and its relation to NP-Complete problems
  • Researched data on possible transcription terminator in Tet A
  • Failure of cre experiments


June 24, 2010


  • Annealed optimized and deoptimized segment 1 TetA ligated into vector
  • Annealed optimized and deoptimized segment 2 TetA ligatied into vector
  • Added weight characteristic to the fluorescent proteins in the Java code
  • Continued exploration of NP-Complete problems
  • Ligations to construct tet constructs


June 27, 2010


  • Inducer curve experiment started on pLac and pLacI constructs
  • Picked colonies from TetA segment 1 & 2 optimized & deoptimized plates
  • Added histograms to the Java Code
  • Researched and analyzed the effectiveness of Cre
  • Size verification of ptet+variant lox sites


June 28, 2010


  • Added the option for the user to input the weights of the various modules and began work on custom construct builder
  • Picked colonies from TetA segment 1 & 2 optimized & deoptimized plates
  • Planned to ligate pBad+RBS+Cre in ampicillin resistant vectors
  • Researched plasmid partitioning


June 29, 2010


  • Screened segment 1 optimized and deoptimized candidate clones using RFLP
  • Screened segment 2 optimized and deoptimized candidate clones using RFLP
  • Finished the simulation program and exported it
  • Explored the set covering problem
  • Researched applications of the knapsack problem in cryptography
  • Ligated ptet+LoxP+RBS+RFP


June 30, 2010


  • Tet titration experiment performed on pLac and pLacI +RBS-RFP-RBS-TetA
  • Ligated TetA onto pLac and pLacI +RBS-RFP-RBS-TetA with no terminator
  • Some final work on the simulation program
  • Discussed new ideas such as integer programming
  • PCR screening of “RFP construct”
  • Ptet+variant lox sites were frozen down


July 1, 2010


  • Preparative BamHI/NheI digest performed on TetA
  • New experiment protocol developed for reduced vector background noise
  • Added terminators to the program
  • Ran test trials of the program and analyzed its results
  • Planned experiments for using Cre as “front” and “back” vector
  • Ligated first “floxed” constructs


July 2, 2010


  • Mini prepped, diagnostic RP digest, preparative digest, ligation, pBAD+RBS-RFP
  • Continued work on the categorization of the knapsack problem
  • Researched Instant Insanity problem
  • PCR screening for “floxed constructs”


July 6, 2010


  • Ligated S04446 and S04447 to J31007
  • Tet titration experiment performed on pLac and pLacI +RBS-RFP-RBS-TetA
  • Added direction of terminators in the simulation
  • Researched cryptography application
  • Size verified “floxed constructs”
  • Digested “Cre construct” as front and back vector


July 7, 2010


  • Ligated S04448 to RBS-TetA
  • Ligated S04449 to RBS-TetA
  • Fixed memory leak in the simulation program
  • Researched integer programming
  • Sent off “floxed constructs" for sequencing
  • Ligated “floxed constructs” into pBad+RBS+Cre as “front” and “back” vector


July 8, 2010


  • IPTG experiment started using pre-induced method
  • IPTG experiment started using varying levels of tetracycline
  • Worked on animation for the simulation and continued analysis of the results of the simulation
  • Discussed integer programming as a group
  • Data suggests something wrong with “cre construct”


July 9, 2010


  • Picked optimized and deoptimized TetA colonies
  • Flourimeter data collected from IPTG experiment
  • Revised some features on the program
  • Began working on theoretical probability models of the different constructs
  • Further experiments with “cre construct”


July 10, 2010


  • Used RFLP to screen for candidate TetA clones
  • Transformed various pLac and pLacI constructs into MG1655 cells
  • Experiments suggest pBad+RBS+Cre from iGem 2010 kit plate is incorrect


July 12, 2010


  • Used RFLP to screen for candidate TetA clones
  • Transformed various pLac and pLacI constructs into MG1655 cells
  • Added slider feature to the simulation program
  • Continued work on the theoretical probability model for Construct A of size 3
  • Tested “cre construct” from 2009 iGem kit plate


July 13, 2010


  • Used RFLP to screen for candidate TetA clones
  • EcoRI/PstI diagnostic digest performed on K199150
  • Added custom prefixes and suffixes to the Oligator
  • Found a general equation for finding theoretical probabilities for Construct A of size 3
  • Sent off “floxed sites for sequencing”


July 14, 2010


  • Ligated segment 2 optimized and deoptimzed TetA behind segment 1
  • IPTG experiment started on I715039-1 and I715039-2
  • Began analyzing MW optimization code
  • Finished theoretical probabilities for Construct A of size 3
  • Cre construct from 2009 plate was incorrect as well


July 15, 2010


  • Cell count data collected from IPTG experiments
  • Flourimeter data collected from IPTG experiments
  • Worked on a separate program using the CAI equation
  • Began working on theoretical probabilities for Construct A of size 4
  • Ligated more “floxed constructs”


July 16, 2010


  • Tet titration experiment started using pSB3T5 vector
  • Tet titration experiment started using optimized and deoptimized TetA
  • Added changes to the optimizer code
  • Researched how to solve a system of recursive relations into closed form
  • Decided to ligate cre into pBad+RBS and pLac+RBS


July 19, 2010


  • Cell count data collected from Tet titrations
  • Tet titration experiment started using optimized and deoptimized TetA
  • Fixed the error in the CAI optimization program
  • Continued analyzing systems of recursive relations
  • Ligated pBad+RBS+Cre and pLac+RBS+Cre


July 20, 2010


  • Flourimeter data collected on IPTG experiment
  • Adapted the Oligator page for the Optimization program, now called the Optimus
  • Made progress on solving the system of recursive relations that we have
  • Performed IPTG and tet experiments
  • PCR screened both “cre constructs”
  • pBad+RBS+Cre ligation unsuccesful


July 21, 2010


  • IPTG experiment started on optimized and deoptmized TetA constructs
  • Passage I715039-1 and I715039-2 experiments started
  • Started to link the ruby program on the webpage
  • Finished theoretical probabilities for Construct A of size 4
  • "Floxed constructs" ligated into pLac+RBS+Cre


July 22, 2010


  • IPTG experiment started using varying tetracycline concentrations
  • Cell count data collected on IPTG TetA experiment
  • Linked the Optimus on the webpage
  • Started theoretical probabilities for Construct A of size 5
  • Cre was religated into pBad+RBS



July 23, 2010


  • Cell count data collected from IPTG experiment
  • Flourimeter data collected from IPTG experiment
  • Worked on the tutorial for the Optimus and added various features
  • Worked on a Matlab tool based on the pancake problem that can find the theoretical probabilities of different modules in different positions
  • Last of the “floxed constructs” were ligated



July 26, 2010


  • Missouri traveled to Davidson to work on wiki and presentation materials
  • The two campuses reunite and share recent findings



July 27, 2010


  • Began work on the team wiki



October 25, 2010


  • Finalizing team wiki


top