Team:Calgary/30 September 2010

From 2010.igem.org

(Difference between revisions)
Line 6: Line 6:
I did another restriction digest of I0500-B0034-MalE since the restriction digest last night failed. This time I tried with EcoRI and SpeI. The restriction digest worked and Colony 10 will be sent down for sequencing tomorrow. The plates from last night  did not grow either. So I retried the construction by retrying the restriction digest. I left the digest overnight and will plate tomorrow.
I did another restriction digest of I0500-B0034-MalE since the restriction digest last night failed. This time I tried with EcoRI and SpeI. The restriction digest worked and Colony 10 will be sent down for sequencing tomorrow. The plates from last night  did not grow either. So I retried the construction by retrying the restriction digest. I left the digest overnight and will plate tomorrow.
-
[[Image:09.28.2010-I0500-B0034-MALE rd.jpg|thumb|400px|Restriction digest of I0500-B0034-MalE colonies 1-12, Lane 1 is control]]
+
[[Image:09.28.2010-I0500-B0034-MALE rd.jpg|thumb|right|400px|Restriction digest of I0500-B0034-MalE colonies 1-12, Lane 1 is control]]
}}
}}

Revision as of 04:12, 17 October 2010

Thursday September 30, 2010

Himika

I did another restriction digest of I0500-B0034-MalE since the restriction digest last night failed. This time I tried with EcoRI and SpeI. The restriction digest worked and Colony 10 will be sent down for sequencing tomorrow. The plates from last night did not grow either. So I retried the construction by retrying the restriction digest. I left the digest overnight and will plate tomorrow.

Restriction digest of I0500-B0034-MalE colonies 1-12, Lane 1 is control